You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High-Resolution Cloud Probe for the ArcticShark UAV and Tethered Balloon Systems

    SBC: STRATTON PARK ENGINEERING CO., INC.            Topic: 20a

    The Arctic is warming at a rate that is nearly twice the global average. Low, shallow, stratus clouds are persistent from spring through early winter in the Arctic and are strong contributors to warming and ice melt in the Arctic. These clouds allow visible sunlight to penetrate to the surface, but trap long- wave radiation emanating upwards from the surface. The result is a cloud blanket that war ...

    SBIR Phase II 2018 Department of Energy
  2. Superconducting Helical Undulator with Superimposed Focusing Gradient for High Efficiency Tapered X-Ray FELs

    SBC: RADIABEAM TECHNOLOGIES, LLC            Topic: 05a

    SASE x-ray FELs are limited to

    SBIR Phase II 2018 Department of Energy
  3. Electron-optical column for a 4 MeV Ultrafast Electron Microscope

    SBC: ELECTRON OPTICA INC            Topic: 06a

    Many atomic processes occur on timescales that are as short as tens to hundreds of femtoseconds. While pulsed lasers have the temporal resolution to investigate these processes, they cannot provide the requisite spatial resolution. Ultrafast electron diffraction (UED) and Dynamic transmission electron microscopy are pulsed electron techniques that have been recently developed to probe the dynamics ...

    SBIR Phase II 2018 Department of Energy
  4. Joining of Ceramic Composites for Nuclear Applications (18-RD-986)

    SBC: UES INC            Topic: 10b

    Ceramic matrix composites, or composites, allow for higher operating temperatures in nuclear reactors and provide improved accident tolerance. However, composites cannot be processed like metals and require joining techniques like brazing to obtain complex three-dimensional shapes. Brazing is not the ideal solution, as brazed joint material may not be chemically stable, hermetic, or neutron irradi ...

    SBIR Phase II 2018 Department of Energy
  5. Techniques for energetic ion assisted in-situ coating of long, small diameter, beam pipes with compacted thick crystalline copper film

    SBC: POOLE VENTURA, INC.            Topic: 25d

    High wall resistivity can cause heating and instabilities in accelerators. Electron clouds in accelerators limit machine performance through associated dynamical instabilities and/or vacuum pressure increases. Coating accelerator vacuum tubes with compacted thick crystalline copper will mitigate those problems and can enhance luminosity. General statement of how this problem is being addressed. Th ...

    SBIR Phase II 2018 Department of Energy
  6. GHz Electron Buncher Compatible with Commercial TEMs for Stroboscopic Imaging with Space-Time Resolution between 10-23 and 10-20 m·s

    SBC: EUCLID TECHLABS, LLC            Topic: 07a

    In the modern technological era, many breakthroughs rely on understanding how advanced nanoscopic materials or devices operate at rates approaching or exceeding 1 GHz. This requires adequate instrumentation. At the moment, none of electron- or photon-based time-resolved techniques/tools is able to provide GHz-scale sampling rates. Factors limiting sampling rates at light sources are complex, and e ...

    SBIR Phase II 2018 Department of Energy
  7. In Situ Structural Repair and Protection of LWR Components Using Cold Spray

    SBC: VRC Metal Systems, LLC            Topic: 10c

    A major problem facing the existing U.S. fleet of Light Water Reactor facilities is stress corrosion cracking of austenitic nickel and iron alloys, which comprise the bulk of wetted components in LWR facilities; up to 70% of wetted non-fuel areas in a typical facility, making this problem particularly widespread and especially prevalent with extended service life. Cold spray technology offers an e ...

    SBIR Phase II 2018 Department of Energy
  8. Nuclear Physics Gamma-ray Imaging System for Real-Time Rare Isotope Harvesting, Monitoring and Radiochemical Separation – NP Imager

    SBC: PHDS COMPANY            Topic: 26b

    The Department of Energy (DOE) Office of Nuclear Physics Research supports user facilities studying the physics of rare radioisotopes. The facilities produce sufficient quantities of rare radioisotopes to be studied and possibly used for new applications, including medical diagnostics and treatment. The DOE Office of Nuclear Physics Isotope Program supports the US supply of many important uncommon ...

    SBIR Phase II 2018 Department of Energy
  9. Enhanced Oxidative Dehydrogenation of Ethane with Facilitated Transport Membranes for Low Cost Production of Ethylene

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 17a

    Ethylene demand is expected to increase by 50% domestically and worldwide over the next 5 years with a scramble to increase supply via expansion or grass root facilities. US capacity will remain at about 20% of the world’s supply and exceed 100 BPPY. To meet this challenge, US-DOE has invented a mixed metal oxide catalyst, M1 for the oxidative dehydrogenation of ethane (C2-ODH) to ethylene at hi ...

    SBIR Phase II 2018 Department of Energy
  10. Novel Algae Technology for CO2 Utilization

    SBC: HELIOS-NRG LLC            Topic: 18c

    There is an urgent need to significantly reduce CO2 emissions from coal burning power plants. Current CO2 capture technologies are too expensive and not economically viable. A new technology that can capture ~90% of the CO2 and significantly reduce the cost of capture is required for commercial viability. Statement of How this Problem is Being Addressed:This project is aimed at the development of ...

    SBIR Phase II 2018 Department of Energy
US Flag An Official Website of the United States Government