You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A COMPACT AND DEPLOYABLE HIGH POWER MICROWAVE ANTENNA

    SBC: Defense Electromagnetic Analys            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. ACT ANALOG COMPUTER FOR PATTERN RECOGNITION

    SBC: Electronic Decisions, Inc.            Topic: N/A

    A NEW COMPUTATIONAL ENGINE BASED ON THE EMERGING TECHNOLOGY OF ACOUSTIC CHARGE TRANSPORT (ACT) HAS BEEN DEVELOPED TO PROCESS ANALOG SIGNALS OR DIGITAL DATA AT SPEEDS MORE THAN THREE ORDERS OF MAGNITUDE BEYOND CURRENT DIGITAL SIGNAL PROCESSOR CHIPS. THE ACT PROGRAMMABLE SIGNAL PROCESSOR IS A MASSIVELY PARALLEL ANALOG DEVICE ON A SINGLE GALLIUM-ARSENIDE CHIP WHICH MAY BE USED TO PERFORM CORRELATIONS ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  3. INNOVATIVE MANUFACTURING TECHNOLOGY FOR REDUCING COSTS OF GUIDED MUNITIONS

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    AN INNOVATIVE APPROACH TO REDUCING THE TOTAL LIFE CYCLE COST OF OWNERSHIP OF GUIDED MUNITIONS IS PROPOSED. FOCUS OF THE APPROACH IS ON THE MANUFACTURING TECHNOLOGY APPLIED TO A MILLIMETER WAVE TARGET SEEKER FRONT END (TRANSMITTER, RECEIVER AND ANTENNA). COST REDUCTION IN LARGE SCALE MANUFACTURING IS POSSIBLE THROUGH USE OF THE FIBER INTEGRATED MILLIMETRICS, A CIRCUIT METHOD WHICH ALLOWS COMPUTER A ...

    SBIR Phase II 1990 Department of DefenseDefense Advanced Research Projects Agency
  4. COVERT V-BAND COMMUNICATIONS ANTENNA TO IMPROVE OPERATIONAL CONTROL OF WIDE AREA MINES

    SBC: Epsilon Lambda Electronics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government