You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
HIGH-POWER-HANDLING INTEGRATED OPTICS COHERENT BEAM COMBINER
SBC: EOSPACE INC. Topic: MDA09036Develop very-low-loss and high optical-power-handling electro-optical waveguide-based components for use for a high-power coherent beam-combining laser system operating at 1 m wavelength
SBIR Phase II 2011 Department of DefenseMissile Defense Agency -
High Energy Laser Technology Innovations for BMDS Directed Energy, Tracking, and Illumination
SBC: nLight Photonics Topic: MDA09037Next generation lasers for Missile Defense ranging applications require scaling pulse brightness and repetition rates in compact and efficient packages. To address this need, nLIGHT proposes to significantly increase the pulse energy of a passively Q-switched diode pumped solid state laser while maintaining excellent beam quality in an efficient master- oscillator power amplifier architecture.
SBIR Phase II 2011 Department of DefenseMissile Defense Agency -
Large Format Dual Band FPA ROIC for Low Flux Environments
SBC: INFRARED LABORATORIES INC Topic: A10025In Phase-I of the project we constructed a unique ROIC design based on our Amplifier-Shared-Dual-Band CTIA (ASDBC) technology to address the problems experienced by the existing ROICs. In Phase-II, we will refine and complete the design, manufacture the ROIC, fabricate the FPA, and test the completed product. One application issue presented by the DBCHI is the large gain variation across the array ...
SBIR Phase II 2011 Department of DefenseArmy -
Forward Bathymetry Sensing for Safe High Speed Boat Operation
SBC: ENGINEERING SCIENCE ANALYSIS CORP Topic: N101077ESA is pleased to provide the following proposal regarding the Lidar Collision Avoidance Bathymetry System (L-CABS), an above-water, laser-based, forward-looking collision avoidance and bathymetry sensor system. The significance of this innovation is the use of lidar sensors mounted above the water surface. Lidar is a mature technology that has been proven in numerous applications, including but n ...
SBIR Phase II 2011 Department of DefenseNavy -
Weapon System Intermittent Fault Detection
SBC: Livewire Innovation, Inc. Topic: AF083113ABSTRACT: Weapon systems or other high value electrical systems within the US military are all subject to wiring faults and degradation. Additionally, weapon systems are kept in service longer because of shrinking defense budgets, further compounding the risks associated with wiring systems. The ability to detect and provide the location of existing wiring problems or pending failures is critic ...
SBIR Phase II 2011 Department of DefenseAir Force -
Tube Launched UAS with Modular Payload Bays and Interfaces
SBC: Brock Technologies, Inc. Topic: AF083006The submarine communitys critical need for advanced payload and expanded flight-envelop capable small Unmanned Aircraft Systems (UAS) is stalled by current tube launched UAS which have low endurance with low performance Intelligence, Surveillance, and Reconnaissance (ISR) packages. Additionally, todays market tube-launched UAS are generally deployed from specific tube launching systems to collect ...
SBIR Phase II 2011 Department of DefenseNavy -
A Cryogenic Grinding System for the High Productivity Grinding of Advanced Materials
SBC: CREARE LLC Topic: DLA09001High performance metals, ceramics, and hard coatings are used in military applications to enhance the performance of key systems needed by the warfighter. One of the most prevalent operations to remove material, achieve the desired surface finish, or enhance part quality is bulk and finish grinding. For typical cutting speeds, conventional synthetic or oil-based coolants are sufficient to remove ...
SBIR Phase II 2011 Department of DefenseDefense Logistics Agency -
A Protoflight High Specific Power Electric Propulsion System
SBC: MSNW LLC Topic: SB101012The Electromagnetic Plasmoid Thruster (EMPT) has demonstrated the ability to ionize, electromagnetically accelerate, and eject a broad range of complex and chemically-reactive molecular gases, including monopropellants. EMPT has the potential to dramatically increase the operational range of existing electric propulsion (EP) systems in both power density, power throttling, and propellant choice. P ...
SBIR Phase II 2011 Department of DefenseDefense Advanced Research Projects Agency -
Ultrashort-Pulse CO2 Laser for Remote Sensing
SBC: STI OPTRONICS, INC. Topic: SB082003An innovative prototype tunable CO2 laser system with subnanosecond pulse duration and high peak power will be built and delivered for experiments on double-resonance remote sensing of gaseous chemical agents being conducted at the Army Aviation and Missile Research, Development, and Engineering Center (AMRDEC). Such a laser is critical for these experiments. The double-resonance technique offer ...
SBIR Phase II 2011 Department of DefenseDefense Advanced Research Projects Agency -
Spoofing Network Architectures in Response to Hostile Reconnaissance
SBC: DataSoft Corp. Topic: A10014The DataSoft Network Obfuscation and Virtualized Anti-reconnaissance system (NOVA) detects hostile network reconnaissance and denies access to real network information while simultaneously providing false network information to attackers. This results in attackers expending significantly extra time and effort, allowing defenders additional time to mount an appropriate response. NOVA is a novel dis ...
SBIR Phase II 2011 Department of DefenseArmy