You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
TAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C.
SBC: The Associated Corp Topic: N/ATAC PROPOSES TO CONDUCT A STUDY TO EVALUATE THE COMPARATIVE EFFECTIVENESS OF VARIOUS FORWARD-LOOKING AUTONOMOUS SENSORS AND ALGORITHMS FOR TLAM-C. THE CURRENT TLAM-C USES A TERRAIN MAPPING RADAR ALTIMETER AND CORRELATES THE SENSED AREA AT KEY WAYPOINTS WITH A STORED DIGITAL REPRESENTATION OF THE TERRAIN AREA AT THE WAYPOINTS TO PROVIDE MID-COURSE AND TERMINAL GUIDANCE CORRECTION TO THE INERTIAL NA ...
SBIR Phase I 1984 Department of DefenseNavy -
INVESTIGATION OF FUNCTIONAL PROGRAMMING IN DEFENSE APPLICATIONS
SBC: Computer Technology Associates Topic: N/ATHE DOD SOFTWARE INITIATIVE CLEARLY IDENTIFIED THE CHALLENGES FOR FUTURE SYSTEMS. THEY WILL HAVE TO BE LARGER AND MORE COMPLEX, DEVELOPED AND DELIVERED MORE RAPIDLY, AND MAINTAINED OVER LONGER PERIODS. TRADITIONAL PROGRAMMING TECHNIQUES, HOWEVER, APPEAR TO HAVE REACHED THEIR LIMITS, MAKING MUCH LARGER SOFTWARE SYSTEMS VIRTUALLY IMPOSSIBLE TO BUILD AND MAINTAIN. AN ALTERNATIVE APPROACH, CALLED FUNC ...
SBIR Phase II 1984 Department of DefenseNavy