You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. LITHOGRAPHY USING CONVENTIONAL, COMMERCIAL RESIST SYSTEMS

    SBC: Abek Inc.            Topic: N/A

    BY OPTIMIZING CONDITIONS, CONVENTIONAL ELECTRON BEAM BY OPTIMIZING CONDITIONS, CONVENTIONAL ELECTRON BEAM RESISTS, SUCH AS PBS, CAN BE USED TO PRODUCE GEOMETRIES IN THE 0.3 TO 0.5 MICRON RANGE IN A CONTROLLED MANNER, USING RASTER SCAN WRITING TECHNIQUES IN A LIMITED PRODUCTION ENVIRONMENT. IN ORDER FOR THESE PATTERNING TECHNIQUES TO BE USEFUL, THE DEFECT DENSITY OF THE FINAL PRODUCT MUST BE VERY T ...

    SBIR Phase I 1984 National Science Foundation
  2. THE PROJECT WILL REVIEW CURRENT INCENTIVES OFFERED BUSINESS FOR ITS INVOLVEMENT WITH THE TARGET POPULATION.

    SBC: Action Management Corpon            Topic: N/A

    THE PROJECT WILL REVIEW CURRENT INCENTIVES OFFERED BUSINESS FOR ITS INVOLVEMENT WITH THE TARGET POPULATION. RESEARCH EFFECTIVE METHODS OF PROVIDING INCENTIVES TO BUSINESS. EXAMINE ALTERNATIVES THAT INCREASE PRIVATE SECTOR INVOLVEMENT. STUDY VARIOUS MARKETING TECHNIQUES TO IMPROVE PRESENTATION OF BENEFIT PACKAGES TO THE PRIVATE SECTOR, E.G., SAVINGS, CUTTING-COST, AND PROFIT MARGIN. THE PROJECT WIL ...

    SBIR Phase I 1984 Department of Health and Human Services
  3. DEVELOPMENT OF A MATHEMATICAL MODEL FOR PREDICTING THE PERCENTAGE FATIGUE LIFE INCREASE RESULTING FROM SHOT PEENED COMPONENTS

    SBC: Airtech Precision Shot            Topic: N/A

    CURRENT SHOT PEENING TECHNOLOGY DOES NOT OFFER THE CAPABILITY TO ACCURATELY PREDICT FATIGUE LIFE BENIFITS. RECENT TEST RESULTS IDENTIFY A HERETOFORE UNDOCUMENTED SURFACE INTEGRITY PHENOMENOM ASSOCIATED WITH PEENING AT RELATIVELY HIGH INTENSITIES WHICH HAS BEEN LINKED TO PREMATURE SPECIMEN FAILURE AT SPECIMEN FAILURE AT FATIGUE LIFE LOWER THAN THAT OF UNPEENED SPECIMEN. DATA PRESENTED BY SEVERAL AU ...

    SBIR Phase II 1984 Department of DefenseAir Force
  4. SOLID-STATE OXYGEN SENSOR

    SBC: Applied Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseAir Force
  5. THE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.

    SBC: APTEK, Inc.            Topic: N/A

    THE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.

    SBIR Phase I 1984 Department of DefenseAir Force
  6. A COMPREHENSIVE ENERGY DIAGNOSTIC PROCEDURE FOR LARGE BUILDINGS

    SBC: Architectural Energy Corporati            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of DefenseArmy
  7. PRIMARY COOLANT RADIONUCLIDE CHARACTERIZATION, MODELLING AND REDUCTION

    SBC: Atlan-tech Inc            Topic: N/A

    A MAJOR BARRIER TO EXTENDING THE BURNUP OF LIGHT WATER REACTOR FUEL IS THE BUILDUP OF FISSION PRODUCTS IN THE REACTOR COOLANT, WHICH MAY APPROACH PLANT CHEMISTRY OR EFFLUENTS TECHNICAL SPECIFICATIONS NEAR THE END OF CORE LIFE. IT IS PROPOSED TO USE CURRENTLY INSTALLED AUTOMATED ISOTOPIC REACTOR COOLANT ASSAY SYSTEMS AT UP TO FOUR OPERATING NUCLEAR POWER REACTORS TO EXPLORE THE RELATIONSHIPBETWEEN ...

    SBIR Phase II 1984 Department of Energy
  8. THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS.

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENTAL EFFORT IS TO DETERMINE THE FEASIBILITY OF DEVELOPING A COMPUTER INTEGRATED ROBOT WORK CELL GAGING FINISHED PARTS OR OTHER ASSEMBLY/MACHINING OPERATIONS. THE FOCUS OF THE RESEARCH IS TO CONTROL THE ROBOT TOOL CONTROL POINT (TCP) THROUGH AN ADAPTIVE FEEDBACK CONTROL SYSTEM. THE ROLE OF THE FEEDBACK CONTROL SYSTEM IS TO CONTROL AND MODIFY THE PATH OF THE TCP TO WIT ...

    SBIR Phase I 1984 Department of DefenseNavy
  9. THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO

    SBC: Autoflex, Inc.            Topic: N/A

    THE OBJECTIVE OF THIS DEVELOPMENT IS TO DETERMINE THE TECHNICAL FEASIBILITY OF DEVELOPING A THREE DIMENSIONAL VISION BASED PASSIVE OBJECT RECOGNITION SYSTEM CAPABLE OF GENERATING THREE DIMENSIONAL COORDINATE LOCATION INFORMATION IN REAL TIME AT VIDEO FRAME RATES OF 30 FRAMES PER SECOND. THE SYSTEM CONFIGURATION UNDER INVESTIGATION WILL UTILIZE PARALLEL PROCESSING OF RAW VIDEO INPUT FROM MULTIPLE C ...

    SBIR Phase I 1984 Department of DefenseNavy
  10. CONTROLLED SOLIDIFICATION OF HAZARDOUS ORGANIC WASTES WITH RECOVERY OF RECYCLABLE COMPONENTS

    SBC: Chemical & Metal Industries, I            Topic: N/A

    N/A

    SBIR Phase I 1984 Environmental Protection Agency
US Flag An Official Website of the United States Government