You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DISPENSER STRUCTURE
SBC: Abaris Topic: N/ATHIS PROJECT IS TO EXAMINE THE STRUCTURAL REQUIREMENTS OF A MUNITIONS DISPENSER, AND IDENTIFY COMPOSITE MATERIALS AND THEIR APPLICATION TO DESIGNS THAT WOULD REDUCE PARASITIC STRUCTURAL WEIGHT BY 30%. THERE ARE A VARIETY OF FIBERS, RESINS, AND MANUFACTURING PROCESSES THAT HAVE THE POTENTIAL FOR ACHIEVING SIGNIFICANT WEIGHT REDUCTION. AS THE PROPERTIES AND COSTS OF COMPLETED COMPONENTS VARYWITH MAN ...
SBIR Phase I 1984 Department of DefenseAir Force -
LITHOGRAPHY USING CONVENTIONAL, COMMERCIAL RESIST SYSTEMS
SBC: Abek Inc. Topic: N/ABY OPTIMIZING CONDITIONS, CONVENTIONAL ELECTRON BEAM BY OPTIMIZING CONDITIONS, CONVENTIONAL ELECTRON BEAM RESISTS, SUCH AS PBS, CAN BE USED TO PRODUCE GEOMETRIES IN THE 0.3 TO 0.5 MICRON RANGE IN A CONTROLLED MANNER, USING RASTER SCAN WRITING TECHNIQUES IN A LIMITED PRODUCTION ENVIRONMENT. IN ORDER FOR THESE PATTERNING TECHNIQUES TO BE USEFUL, THE DEFECT DENSITY OF THE FINAL PRODUCT MUST BE VERY T ...
SBIR Phase I 1984 National Science Foundation -
SOLID-STATE OXYGEN SENSOR
SBC: Applied Technologies, Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseAir Force -
THE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.
SBC: APTEK, Inc. Topic: N/ATHE DEVELOPMENT OF PASSIVE ACOUSTIC INSTRUMENTATION SYSTEMS AND TECHNOLOGY FOR REENTRY VEHICLE FLIGHT TEST MEASUREMENT OF HYDROMETER MASS AND NUMBER DENSITY IS PROPOSED.
SBIR Phase I 1984 Department of DefenseAir Force -
THE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM.
SBC: Arbus, Inc. Topic: N/ATHE PRIMARY PURPOSE OF THIS PROJECT IS TO REDUCE THE REQUIREMENTS FOR INITIAL ALIGNMENT ACCURACY WHEN BRINGING A PAIR OF CONNECTORS TOGETHER PRIOR TO MATING THEM. THIS WILL BE ACCOMPLISHED BY INVESTIGATING THE USE OF A TAPERED OR CONICAL DESIGN TO INCLUDE A PRELIMINARY LATCHING FEATURE TO CAPTURE AND TO CAUSE ALIGNMENT OF A PAIR OF COMPLEMENTARY CONNECTORS. THE INVESTIGATION WILL TAKE INTO CONSIDE ...
SBIR Phase I 1984 National Aeronautics and Space Administration -
A COMPREHENSIVE ENERGY DIAGNOSTIC PROCEDURE FOR LARGE BUILDINGS
SBC: Architectural Energy Corporati Topic: N/AN/A
SBIR Phase I 1984 Department of DefenseArmy -
PRIMARY COOLANT RADIONUCLIDE CHARACTERIZATION, MODELLING AND REDUCTION
SBC: Atlan-tech Inc Topic: N/AA MAJOR BARRIER TO EXTENDING THE BURNUP OF LIGHT WATER REACTOR FUEL IS THE BUILDUP OF FISSION PRODUCTS IN THE REACTOR COOLANT, WHICH MAY APPROACH PLANT CHEMISTRY OR EFFLUENTS TECHNICAL SPECIFICATIONS NEAR THE END OF CORE LIFE. IT IS PROPOSED TO USE CURRENTLY INSTALLED AUTOMATED ISOTOPIC REACTOR COOLANT ASSAY SYSTEMS AT UP TO FOUR OPERATING NUCLEAR POWER REACTORS TO EXPLORE THE RELATIONSHIPBETWEEN ...
SBIR Phase II 1984 Department of Energy -
"CULTURING AMPHIBIANS FOR BIOMEDICAL RESEARCH"
SBC: Central Valley Biological Inc Topic: N/AN/A
SBIR Phase I 1984 Department of Health and Human Services -
CONTROLLED SOLIDIFICATION OF HAZARDOUS ORGANIC WASTES WITH RECOVERY OF RECYCLABLE COMPONENTS
SBC: Chemical & Metal Industries, I Topic: N/AN/A
SBIR Phase I 1984 Environmental Protection Agency -
AUTIMICROBIAL IMPREGNATION OF SILICONE RUBBER
SBC: Colorado Biomedical Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of Health and Human Services