You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Microwave Mapping-Transparency Sensor System
SBC: COMPASS TECHNOLOGY GROUP, LLC Topic: AF121C123ABSTRACT: Aircraft transparency systems such as canopies incorporate conductive layers that provide electromagnetic interference (EMI) shielding. These conductive layers require inspection during manufacturing and throughout the life of the aircraft to ensure proper electrical performance is achieved and maintained. Current manufacturing inspections are conducted manually, are time consuming, and ...
SBIR Phase II 2013 Department of DefenseAir Force -
Improved Satellite Ground C3
SBC: Braxton Technologies, LLC Topic: AF131069ABSTRACT:Braxtons primary goal is to integrate and test advanced space asset command, control, and communications (C3) assets so that the current low bandwidth, high cost USAF systems can use high bandwidth, high reliability, low cost, automated commercial communications assets and system resource planning methods.Braxton will leverage 20 years of tracking, telemetry and commanding (TT&C), mission ...
SBIR Phase II 2015 Department of DefenseAir Force -
Air Launch Testbed for Endoatmospheric Hypersonic Trajectories
SBC: GENERATION ORBIT LAUNCH SERVICES, INC. Topic: AF141081ABSTRACT:This SBIR proposal covers the preliminary design and initial hardware and software in-the-loop testing of the GOLauncher 1, a single stage liquid air launched rocket system, for utilization in future hypersonic flight testing efforts. Major objectives include completing prelimianry design of the system based on requirements defined during Phase I, further validation of cost and schedule e ...
SBIR Phase II 2015 Department of DefenseAir Force -
High-Speed Weapon Radomes
SBC: FIRST RF CORPORATION Topic: AF121092ABSTRACT:As more and more advanced hypersonic weapons are developed, vehicle temperatures are expected to near 1250K (977C); as flight times increase, these temperatures are expected to saturate the entire vehicle.Typically, forward-looking RF and IR sensors are collocated in the same protective radome, which degrades the performance of both systems.FIRST RF proposes a significantly different appr ...
SBIR Phase II 2015 Department of DefenseAir Force -
Enabling Automated Real-Time AFSCN Scheduling- Ace Premier Intelligent Distributed Scheduler (AceIDS)
SBC: Braxton Technologies, LLC Topic: AF131069ABSTRACT:Braxtons primary goal is to leverage our Phase I prototyping and continue research to evolve the ACE Premier Intelligent Distributed Scheduler (AceIDS) products capability to automatically optimize AFSCN and non-AFSCN (commercial provisioning) resource allocation. We fuse electronically-generated routine and real-time priority access requests with real-time space and ground resource statu ...
SBIR Phase II 2015 Department of DefenseAir Force -
Thermal Ground Planes for High Power Solid-State Lasers
SBC: i2C Solutions, LLC Topic: MDA13022A key challenge toward future directed energy systems is the development of power and thermal management technologies needed to support the laser systems, particularly pump diodes.I2C Solutions and the University of Colorado have developed a Thermal Ground Plane (TGP) technology that interfaces with doide laser bars in order to spread heat and transport it to the laser cooling loop.During Phase II ...
SBIR Phase II 2015 Department of DefenseMissile Defense Agency -
GPS Autonomous Micro-Monitor (GAMMA)
SBC: ATMOSPHERIC & SPACE TECHNOLOGY RESEARCH ASSOCIATES LLC Topic: AF112065ABSTRACT:Ionospheric scintillation and TEC are required by the IORD. We propose a GPS Autonomous Micro-Monitor (GAMMA) that makes measurements of Ionospheric scintillation and TEC. GAMMA will be remotely deployable, such as on an ocean buoy or in a battlefield. It will send data to the user via the Iridium satellite network in near real-time. GAMMA will make use of ASTRAs existing Connected Autono ...
SBIR Phase II 2015 Department of DefenseAir Force -
Thermal Interface Material Maturation Program for Air Force Power Electronics Applications
SBC: ADA TECHNOLOGIES, INC. Topic: AF09BT22ABSTRACT: Thermal interface materials (TIMs) constitute an essential part of thermal management which is quickly becoming the limiting factor in high power, high functional density, and increasingly small-sized electronics for future U.S. Air Force (AF) platforms. TIMs aim to ensure a continuous thermal conductivity path between the heat source and heat sink/dissipater, thus permitting the effici ...
SBIR Phase II 2015 Department of DefenseAir Force -
Fusion of Space Weather Data with Satellite Telemetry
SBC: DATA FUSION & NEURAL NETWORKS, LLC Topic: AF112066ABSTRACT:The DF&NN team proposes to provide automated space weather (SpWx) attribution tools to characterize abnormal events detected at operational sites using the DF&NN patented Enterprise Satellite-as-a-Sensor (E-SAS) system.The DF&NN Space Situational Awareness (SSA) fusion tools, Modern Technology Solutions Incorporated operational experience, Space Environment Technologies SpWx expertise, an ...
SBIR Phase II 2015 Department of DefenseAir Force -
Mode Adapting Etched Air Taper Fiber Optic Pump Combiner
SBC: Optical Engines, Inc. Topic: AF131011ABSTRACT: The semiconductor pumped fiber laser has generated considerable interest for High Energy Lasers (HELs) in a number of BMDS applications including long range sensing, communications and missile defense. The potential efficiency, compact size and low weight, reliability and ruggedness are attractive for these and other directed energy applications. A key requirement is the creation and ...
SBIR Phase II 2015 Department of DefenseAir Force