You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Microwave Mapping-Transparency Sensor System

    SBC: COMPASS TECHNOLOGY GROUP, LLC            Topic: AF121C123

    ABSTRACT: Aircraft transparency systems such as canopies incorporate conductive layers that provide electromagnetic interference (EMI) shielding. These conductive layers require inspection during manufacturing and throughout the life of the aircraft to ensure proper electrical performance is achieved and maintained. Current manufacturing inspections are conducted manually, are time consuming, and ...

    SBIR Phase II 2013 Department of DefenseAir Force
  2. Improved Satellite Ground C3

    SBC: Braxton Technologies, LLC            Topic: AF131069

    ABSTRACT:Braxtons primary goal is to integrate and test advanced space asset command, control, and communications (C3) assets so that the current low bandwidth, high cost USAF systems can use high bandwidth, high reliability, low cost, automated commercial communications assets and system resource planning methods.Braxton will leverage 20 years of tracking, telemetry and commanding (TT&C), mission ...

    SBIR Phase II 2015 Department of DefenseAir Force
  3. Air Launch Testbed for Endoatmospheric Hypersonic Trajectories

    SBC: GENERATION ORBIT LAUNCH SERVICES, INC.            Topic: AF141081

    ABSTRACT:This SBIR proposal covers the preliminary design and initial hardware and software in-the-loop testing of the GOLauncher 1, a single stage liquid air launched rocket system, for utilization in future hypersonic flight testing efforts. Major objectives include completing prelimianry design of the system based on requirements defined during Phase I, further validation of cost and schedule e ...

    SBIR Phase II 2015 Department of DefenseAir Force
  4. Long-Acting G-CSF Analog for Treating ARS

    SBC: BOLDER BIOTECHNOLOGY INC            Topic: NIAID

    DESCRIPTION provided by applicant Development of radiological nuclear medical countermeasures to treat Acute Radiation Syndrome ARS is a high priority research area for NIAID Bone marrow is one of the most sensitive tissues to radiation damage and impaired hematopoiesis is one of the first clinical signs of excessive radiation exposure often resulting i death Granulocyte colony stimulating ...

    SBIR Phase II 2013 Department of Health and Human ServicesNational Institutes of Health
  5. Long-Acting G-CSF Analog for Treating ARS

    SBC: BOLDER BIOTECHNOLOGY INC            Topic: NIAID

    DESCRIPTION (provided by applicant): Development of radiological/nuclear medical countermeasures to treat Acute Radiation Syndrome (ARS) is a high priority research area for NIAID. Bone marrow is one of the most sensitive tissues to radiation damage and impaired hematopoiesis is one of the first clinical signs of excessive radiation exposure, often resulting i death. Granulocyte colony-stimulating ...

    SBIR Phase II 2013 Department of Health and Human ServicesNational Institutes of Health
  6. An Automated Platform for High-throughput Network Electrophysiology

    SBC: Axion Biosystems, Inc.            Topic: 102

    DESCRIPTION provided by applicant In response to the program announcement for Phase IIb proposals for complex in vitro brain and behavior tools PA this proposed study automates all aspects of in vitro Microelectrode Array MEA technology to deliver the first ever high throughput MEA based screening system This development will not only enable rapid advancements in the study of basi ...

    SBIR Phase II 2013 Department of Health and Human ServicesNational Institutes of Health
  7. An Automated Platform for High-throughput Network Electrophysiology

    SBC: Axion Biosystems, Inc.            Topic: NINDS

    DESCRIPTION (provided by applicant): In response to the program announcement for Phase IIb proposals for complex, in-vitro brain and behavior tools (PA-11-135), this proposed study automates all aspects of in-vitro Microelectrode Array (MEA) technology todeliver the first ever high throughput MEA-based screening system. This development will not only enable rapid advancements in the study of basic ...

    SBIR Phase II 2013 Department of Health and Human ServicesNational Institutes of Health
  8. IGF OT IGF SMOKESCREEN GENETIC SCREENING TOOL FOR TOBACCO DEPENDENCE and TREATMENT APPROACHES POP MOD SUPPLEMENT WITHIN SCOPE AND EXTENSION

    SBC: BIOREALM, LLC            Topic: NIDA

    Not Available

    SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health
  9. BMX-001 as a Therapeutic Agent for Treatment of High-Grade Gliomas

    SBC: BIOMIMETIX JV LLC            Topic: NCI

    DESCRIPTION provided by applicant Phase and Phase clinical trials of a new class of redox active pharmaceutical are proposed in high grade glioma WHO grade III and IV This project will test a compound that crosses the blood brain barrier and which prevents hippocampal stem cell loss and white matter degradation following radiation therapy RT The compound also inhibits tumor regrowth f ...

    SBIR Phase II 2015 Department of Health and Human ServicesNational Institutes of Health
  10. High-Speed Weapon Radomes

    SBC: FIRST RF CORPORATION            Topic: AF121092

    ABSTRACT:As more and more advanced hypersonic weapons are developed, vehicle temperatures are expected to near 1250K (977C); as flight times increase, these temperatures are expected to saturate the entire vehicle.Typically, forward-looking RF and IR sensors are collocated in the same protective radome, which degrades the performance of both systems.FIRST RF proposes a significantly different appr ...

    SBIR Phase II 2015 Department of DefenseAir Force
US Flag An Official Website of the United States Government