You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Principled Security Analysis of the Firmware Binaries via Guaranteed Formal Verification and Scalable Dynamic Monitoring

    SBC: Sekurity LLC            Topic: HSB0181008

    Consequently, to protect the mobile/IoT platforms against complex security attacks, there is a need for effective analysis of mobile/IoT firmware. Such a solution is currently missing in the market. In this DHS SBIR effort, we will develop BINSEC, a mobile/IoT firmware binary security analysis framework. To ensure acceptable scalability, usability, and universality across different firmware binary ...

    SBIR Phase I 2018 Department of Homeland Security
  2. SAFARI: Scalable Analysis of Firmware for AndRoid and IOS

    SBC: KRYPTOWIRE, LLC            Topic: HSB0181008

    To address the supply chain threats that stem from vulnerable or malicious software distributed through firmware on mobile and IoT devices via binary firmware images, we propose a scalable, comprehensive, and automated framework to detect firmware-borne threats, both malicious and (un)intentionally insecure, present in Android and iOS devices. We use a workflow encompassing three analysis techniqu ...

    SBIR Phase I 2018 Department of Homeland Security
  3. LMR-P25 and LTE Mission Critical Push to Talk Interface Service

    SBC: CATALYST COMMUNICATIONS TECHNOLOGIES, INC.            Topic: HSB0181005

    In this Phase I project, we will determine the feasibility of building an interworking solution to provide interoperability between LTE and LMR systems for mission critical operations, while improving interoperability between current LMR systems.InPhase I we will build upon the requirements work already done by NPSTC to determine the feasibility of meeting requirements for interworking when standa ...

    SBIR Phase I 2018 Department of Homeland Security
  4. Shallow Water Bathymetric Survey Systems

    SBC: CREARE LLC            Topic: 829

    TECHNICAL ABSTRACT: Ship groundings can cause sever environmental damage to the delicate ecosystems such as coral reefs, seagrass beds, and beaches. At present, survey work is performed by hand – a method that is inefficient and difficult to perform reliably. Improved bottom survey tools are clearly needed to evaluate the extent and type of damage and assist in determining remediation efforts. ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Under Keel Clearance Management in Support ofPrecision Navigation

    SBC: W R SYSTEMS LTD.            Topic: 828

    TECHNICAL ABSTRACT: WR’s approach involves design of a modular, S-129 compliant Under Keel Clearance - Risk Management System (UKC-RMS). This will allow for the Electronic Chart Display and Information System (ECDIS), ECS, PPUs, and other situational awareness applications to have S-129 Exchange Sets developed for a planned route.In WR’s design, a system such as an ECDIS generates an S40X Rout ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Autonomous Meteorological Measurement System

    SBC: CREARE LLC            Topic: 8212

    TECHNICAL ABSTRACT: NOAA and the National Weather Service maintain an immense network of automated maritime, surface, and upper-air observing stations throughout the world and at great expense. These automated stations provide regularly updated data for both short-term weather prediction and long-term climate models. Maritime and surface observations occur as frequently as every 10 to 20 minutes, ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  7. A Tube-Deployed Expendable UAV for AtmosphericSensing

    SBC: BARRON ASSOCIATES, INC.            Topic: 8213

    TECHNICAL ABSTRACT: NOAA is pursuing sustained, in-situ sensing technology to support improved atmospheric modeling of the upper ocean boundary environment, including the air-sea interface, during turbulent storms. Improved atmospheric modeling in this critical region will lead to better forecasting and support NOAA's mandate to protect property and save lives. Small, unmanned aircraft, equipped w ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  8. Clean Energy Source to Power NOAA Long-termObservation and Monitoring Networks

    SBC: CREARE LLC            Topic: 8211

    TECHNICAL ABSTRACT: Creare proposes to develop a self-sustained small-scale power conversion system to power NOAA’s weather monitoring network stations located in harsh uninhabited locations. Our miniature heat engine will take advantage of the existing year-round thermal gradients found between water and air in Arctic regions. Our baseline approach is the development of a compact Turbo-Rankine ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  9. "Big Eye" Binoculars Extension Kit for Automating Bearing/Range Measurement and Image Storage

    SBC: R3 DIGITAL SCIENCES, INC.            Topic: 823

    TECHNICAL ABSTRACT: R3 Digital Sciences, Inc. (R3-DS) proposes to develop and commercialize an extension kit for "Big-Eye" and other binoculars that will automatically compute and store distance and bearing assessments by combining vertical reticle and stereoscopy measurement with motion analysis techniques. It will also capture and store photographic and video evidence of what the observer sees t ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  10. Development of the Weather “Action Chain” Enabler (ACE) Application

    SBC: BLUE STORM ASSOCIATES INC.            Topic: 834

    TECHNICAL ABSTRACT: In this Phase I effort, PEMDAS Technologies and Innovations (PEMDAS), in collaboration with subcontractor Westover Studios, proposes to assess the feasibility of developing an innovative tool that allows forecasters to easily provide real-time threat tracking information to be used by the public to confirm the existence and location of a weather- or water-related hazards in a m ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government