You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Weather "Action-Chain" Enabler (ACE) Application

    SBC: BLUE STORM ASSOCIATES INC.            Topic: 834

    In this Phase II effort, PEMDAS Technologies and Innovations (PEMDAS), in collaboration with subcontractor Westover Studios, proposes to develop a functional prototype of the Weather “Action Chain” Enabler (ACE) application using the technologies identified, knowledge gained, and preliminary design conceived during the Phase I effort. As designed, the Weather ACE application will be a non-intr ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Under Keel Clearance- Risk Management System (UKC-RMS)

    SBC: W R SYSTEMS LTD.            Topic: 828

    The S‐100 specification is a new geospatial standard for hydrographic data, that is presently under development by the International Hydrographic Organization (IHO). Once the S‐100 based products and services are fully developed by the IHO, current datasets will be scheduled for obsolescence, and the Hydrographic Offices (HOs) will no longer produce them. Companies offering e‐navigation solu ...

    SBIR Phase II 2019 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Under Keel Clearance Management in Support ofPrecision Navigation

    SBC: W R SYSTEMS LTD.            Topic: 828

    TECHNICAL ABSTRACT: WR’s approach involves design of a modular, S-129 compliant Under Keel Clearance - Risk Management System (UKC-RMS). This will allow for the Electronic Chart Display and Information System (ECDIS), ECS, PPUs, and other situational awareness applications to have S-129 Exchange Sets developed for a planned route.In WR’s design, a system such as an ECDIS generates an S40X Rout ...

    SBIR Phase I 2018 Department of CommerceNational Oceanic and Atmospheric Administration
  4. Ultrasensitive Methods for Tribology

    SBC: BIOTRACES, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Science Foundation
  5. Ultra-Hard Boron Coatings through Vacuum Arc Depostion

    SBC: HY-Tech Research Corp.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Science Foundation
  6. Synthesis of Well-Defined Magnetic Nanoparticles for Recording Media

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    SBIR Phase I 1999 National Science Foundation
  7. STTR Phase I: Smart Flexible Piezoelectric/Polymer Composite Nanostructures

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    STTR Phase I 1999 National Science Foundation
  8. STTR Phase I: Rugged Piezoelectric Sensor Technology for High Temperature, Corrisive Environments

    SBC: BIODE, INC.            Topic: N/A

    N/A

    STTR Phase I 1999 National Science Foundation
  9. STTR Phase I: Magneto-Rheological Fluids for Sensor Actuator Systems

    SBC: MATERIALS MODIFICATIONS INC            Topic: N/A

    N/A

    STTR Phase I 1999 National Science Foundation
  10. STTR Phase I: Integrated Water Quality Monitoring System

    SBC: Airak, Inc.            Topic: N/A

    N/A

    STTR Phase I 1999 National Science Foundation
US Flag An Official Website of the United States Government