You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    STTR Phase I 1999 National Aeronautics and Space Administration
  2. N/A

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    STTR Phase II 1999 National Aeronautics and Space Administration
  3. Pyrolysis Processing for Solid Waste Resource Recovery in Space

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  4. Study of Agent Effectiveness in Suppression of Aircraft Post-Crash Cabin Fires Using Advanced FT-IR Diagnostics

    SBC: ADVANCED FUEL RESEARCH, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  5. A NON-INTRUSIVE OPTICAL FLUID QUALITY SENSOR

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  6. Auto-Coupler System for Engine Test Stands

    SBC: AJT and Associates, Inc            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  7. N/A

    SBC: ARGONIDE CORPORATION, THE            Topic: N/A

    N/A

    SBIR Phase II 1999 National Aeronautics and Space Administration
  8. N/A

    SBC: Blue Line Engineering Co            Topic: N/A

    N/A

    SBIR Phase II 1999 National Aeronautics and Space Administration
  9. Levitated Segmented Mirror Array

    SBC: Blue Line Engineering Co            Topic: N/A

    N/A

    SBIR Phase I 1999 National Aeronautics and Space Administration
  10. N/A

    SBC: BOULDER NONLINEAR SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government