You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 11a Sustainable Recovery of Fuel Cell and Electrolyzer Materials

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: C5611a

    Renewable energy sources are experiencing a surge of growth due to rising power demand but suffer asynchronous production relative to societal needs. To balance the overproduction during low demand and underproduction during high demand, proton exchange membrane (PEM) based electrolyzers (capable of producing zero-carbon, green hydrogen) and fuel cells (for clean electricity generation and zero em ...

    SBIR Phase I 2023 Department of Energy
  2. 20c Polymer Composites with Enhanced Thermal Conductivity

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: C5620c

    Plastics (polymers) are used widely in energy, industry, and defense sectors due to their low cost and weight, processibility, and electrical insulation properties. Unfortunately, this class of materials is also thermally insulating, which restricts their usefulness in applications where heat is generated and has a direct effect on the performance (e.g. electronics and computing, LED lighting, hea ...

    SBIR Phase I 2023 Department of Energy
  3. 41f Development of a Continuous Cost Effective Kr Xe Capture Process for Nuclear Fuels Reprocessing

    SBC: TETRAMER TECHNOLOGIES LLC            Topic: C5641f

    Nuclear energy is one of the most favorable and cheapest alternatives to fossil fuels, and it can be scaled up to meet global energy demands. The mass deployment of nuclear energy as a low-emissions source requires the reprocessing of used nuclear fuel to recover fissile materials and mitigate radioactive waste. A major concern with reprocessing used nuclear fuel is the release of gaseous radionuc ...

    SBIR Phase I 2023 Department of Energy
  4. Applications of AI to ensemble forecasts of compound extreme weather events in support of operational adaptation of electric utilities

    SBC: CLIMATE FORECAST APPLICATIONS NETWORK, LLC            Topic: 91

    We propose a high-impact innovation for weather forecasting that integrates global ensemble weather forecasts with an AI-driven post-processing model of extreme weather indices. This innovation will provide the basis for skillful probabilistic forecasts of compound extreme weather events at extended lead times. Extreme weather/climate events of relevance to electric utilities focused on in Phase I ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  5. Hydrosat: Next Generation High-Resolution Daily Surface Temperature for Interconnected Earth Processes

    SBC: HYDROSAT INC            Topic: 94

    Temperature is the critical signal that allows monitoring of a myriad of Earth’s processes. From direct measurements of wildfire and urban heat to more complex relationships with drought, agriculture, aquaculture, and biodiversity, maintaining a steady pulse on Earth’s surface temperature enables us to mitigate for and adapt to the impacts of extreme events and increasingly variable water avai ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Low SWaP, UxS-Mounted System for In-Situ Monitoring of Harmful Algal Blooms

    SBC: HYDROSAT INC            Topic: 92

    The brevetoxins (PbTx) produced by Karenia brevis cause harmful algal blooms (HAB) or "red tide" in seawater. Currently, the only available ways of detecting PbTx are laboratory tests such as enzyme-linked immunosorbent assays, which are expensive and slow, and require complex instrumentation and multiple processing steps. In previous work Intelligent Optical Systems (IOS) demonstrated a compact l ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Fleet and Flight Operations Integration and Optimization in a Mixed-Advanced Air Mobility Environment

    SBC: AERIAL VANTAGE, INC.            Topic: A3

    We propose an innovation for a data-driven Artificial Intelligence/Machine Learning (AI/ML) model for uncrewed aviation fleet and flight operations optimization (UA-FFOpt) that will be trained with real-world data from an active flight program in the State of Michigan and at a partner cattle ranch in Florida. UA-FFOpt will leverage our existing Intellectual Property (IP), AVIATE, and NCR. AVIATErs ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  8. 18b MEMBRANES FOR ELECTROCHEMICAL ENERGY STORAGE APPLICATIONS – Polymeric membranes for solar fuels generators-Novel dense-PBI membranes for photoelectrochemical hydrogen production

    SBC: Greenway Energy LLC            Topic: C5318b

    Recent studies seem to suggest that distributed and semi-central hydrogen production systems have potential in the near to mid-term for small/medium scale market penetration. Photoelectrochemical (PEC) water splitting has been considered the ultimate method to produce hydrogen as well as other fuels, directly from solar radiation. The process is simple and has potential for high conversion efficie ...

    SBIR Phase I 2022 Department of Energy
  9. Topic 22b- Low-cost, high-performance hydrogen storage technology solutions for fossil-integrated energy storage systems

    SBC: Greenway Energy LLC            Topic: C5322b

    Co-location of energy storage with fossil fuel power plants helps to improve plant flexibility, promote efficient plant operations, and increase plant lifetime. Compared to battery storage, Hydrogen Energy Storage (HES) systems offer the advantages of potential lower cost, long cycle life and no self-discharge leading to long-term, seasonal storage of off-peak electricity. Two HES systems will be ...

    SBIR Phase I 2022 Department of Energy
  10. Solid State Welding for Space

    SBC: T.G.V. ROCKETS INC.            Topic: Z4

    TGV proposes to build a modular testbed that can scale ultrasonic additive manufacturing and test multiple material combinations in vacuum conditions.nbsp; A lighter smaller sonotrode will be developed which will be tracable to testing on ISS or future space platforms but can serve to mature solid state welding designs and concepts in the current era

    SBIR Phase I 2022 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government