You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Applications of AI to ensemble forecasts of compound extreme weather events in support of operational adaptation of electric utilities

    SBC: CLIMATE FORECAST APPLICATIONS NETWORK, LLC            Topic: 91

    We propose a high-impact innovation for weather forecasting that integrates global ensemble weather forecasts with an AI-driven post-processing model of extreme weather indices. This innovation will provide the basis for skillful probabilistic forecasts of compound extreme weather events at extended lead times. Extreme weather/climate events of relevance to electric utilities focused on in Phase I ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Low SWaP-C, Flight-Capable Distributed Fiber-Optic Sensing Platform

    SBC: SEQUENT LOGIC LLC            Topic: A2

    The firm proposes to perform studies related to size, weight, power, cost reduction, and ruggedizationnbsp;of a flight-capable, multi-parameter distributed fiber-optic sensing interrogator for testing advanced flight vehicles including those pertaining to NASArsquo;s Integrated Aviation Systems Program (IASP) Flight Demonstrations and Capabilities (FDC) project. The technology will aid understandi ...

    SBIR Phase I 2023 National Aeronautics and Space Administration
  3. Infini-D Summits: An Online Platform for Immersive Full-Class Literacy Simulations

    SBC: INFINID LEARNING INC            Topic: 91990023R0011

    Not available

    SBIR Phase I 2023 Department of EducationInstitute of Education Sciences
  4. UAS Traffic Management (UTM) Prototype for 24 Hour Aerial Firefighting

    SBC: TRIDENT SENSING, INC.            Topic: A3

    Climate change is increasing the frequency and severity of western wildfires. Threats to people and infrastructure are growing with more population living in the wildland-urban interface. Blindly throwing more resources at the problem while doing things the same way is not a cost-effective. Extending manned and unmanned aerial firefighting to 24-hour, second-shift operations will provide a major i ...

    SBIR Phase II 2023 National Aeronautics and Space Administration
  5. Nondestructive Instrumentation for Real-Time On-Demand Battery State Monitoring

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: S13

    Battery health monitoring is particularly crucial for space applications since battery shutoff or complete drain can be catastrophic. The battery management system (BMS) is vital to avoid such instances. Conventional on-board BMS are currently limited to the monitoring of extrinsic parameters including voltage, current, and temperature. From these, batteryrsquo;s state of charge (SoC) and state of ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
  6. Further development and demonstration of S-band Venus Capable Radio Transmitter

    SBC: INNOSYS, INC.            Topic: S4

    The objective is to develop and implement an S-band communication transmitter/radio capable of operation at extreme high temperatures and pressures in hostile and corrosive environments such as those found on the surface of Venus.nbsp; This extreme environment transmitter/radio will be based on our Phase I prototype 500oC capable S-band power amplifier microwave integrated circuit (MIC) which empl ...

    SBIR Phase II 2022 National Aeronautics and Space Administration
  7. Optical Detection of Lightning via Diffractography

    SBC: Lumos Imaging Inc.            Topic: S11

    Recording spatial and spectral content has been the traditional domain of hyperspectral cameras. They produce very large datasets that require significant storage, transmission and processing capabilities. Despite the great usefulness of this information, they are captured in a very inefficient way; in many important problems, only a tiny subspace of the signal is necessary to produce the correspo ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
  8. UAS Traffic Management (UTM) Concept Demonstration for 24 Hour Aerial Firefighting

    SBC: TRIDENT SENSING, INC.            Topic: A3

    Climate change is increasing the frequency and severity of western wildfires. Threats to people and infrastructure are growing with more population living in the wildland-urban interface. Blindly throwing more resources at the problem while doing things the same way is not a cost-effective solution.nbsp;Extending manned and unmanned aerial firefighting to 24-hour operations will provide a major in ...

    SBIR Phase I 2022 National Aeronautics and Space Administration
  9. Cold Spray Low-Friction Composite Metal-Solid Lubricant Coatings

    SBC: APPLIED TUNGSTENITE CORP            Topic: S4

    nbsp;In Phase II, Applied Tungstenite will further explore the cold spray deposition settings and coating compositions to develop a set of coatings that are ready for providing to our customers.In addition to further refining coatings based on the metals studied in Phase I, Applied Tungstenite will expand the trade space to include other base metals, to produce coatings with optimal materials prop ...

    SBIR Phase II 2021 National Aeronautics and Space Administration
  10. Castable Inorganic Composite Potting Material for High-Temperature Electromagnets

    SBC: HIFUNDA LLC            Topic: Z10

    This Phase II proposal is being submitted after the successful completion of HiFundarsquo;s Phase I SBIR project which was responsive to NASArsquo;s request for proposals that address improved materials or fabrication processes to reduce the total life cycle cost of electric propulsion thrusters. Insulation and potting degradation during thruster operations can lead to early thruster failures that ...

    SBIR Phase II 2021 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government