You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Social-Simentor: Interactive Simulation e-Learning Tool to Develop Interpersonal Skills for Individuals with Cognitive Disabilities to Improve Hiring and Retention

    SBC: Access Tech            Topic: N/A

    An interactive application that employs social interactions to teach key social conventions, including appropriate responses, reacting to body language and facial expressions, and the ability to ask for help to facilitate functioning in society

    SBIR Phase I 2005 Department of Education
  2. Development of Marine Turbine Using a Direct Drive Permanent Magnet Generator

    SBC: Distributed Energy Systems            Topic: 28c

    79729S Ocean currents constitute a potentially enormous renewable energy resource; however, existing technologies for capturing this energy are only in the prototype stage, are small in scale (less than 1 megawatt), and are not grid-connected. Although there is a considerable overlap in technology with the more mature field of wind energy, new robust technologies will have to be developed that ar ...

    SBIR Phase I 2005 Department of Energy
  3. Sectional Permanent Magnet Generator and Power Electronics For Multi-Megawatt Direct Drive Wind Turbines

    SBC: Distributed Energy Systems            Topic: 29

    79659S As direct drive wind turbines increase in size, the diameter of their generators increases to the point where it is no longer possible to ship them as a single unit. While some companies have addressed this issue by using wound rotor generators that can be assembled on site, this approach suffers from the inherent lower efficiency and reliability of the wound rotor technology. To date, no ...

    SBIR Phase I 2005 Department of Energy
  4. Diesel Plasma Reformer

    SBC: FuelCell Energy, Inc.            Topic: N/A

    78150B The catalytic reforming of diesel fuel in Solid Oxide Fuel Cell (SOFC) systems must overcome a number of challenging issues: (1) the deactivation of the catalyst by sintering and sulfur poising; (2) the requirement for a large fuel processing system as a result of high space velocity requirements; and (3) the lack of durability of the catalysts, which require frequent replacement due to "c ...

    SBIR Phase I 2005 Department of Energy
  5. A Novel Growth Technique for Large Diameter AlN Single Crystal

    SBC: FAIRFIELD CRYSTAL TECHNOLOGY, LLC            Topic: 22

    78072S III-V nitride-based, high brightness, UV and visible light emitting diodes (LEDs) are of a great interest for general illumination, but the low light output efficiencies of current high brightness LEDs are still inadequate. A key material issue preventing the achievement of higher light output efficiency in LEDs is the poor crystalline quality of the nitride epitaxial layers that result fr ...

    SBIR Phase I 2005 Department of Energy
  6. An Ultra-Precise System for Electrical Resistivity Tomography Measurements

    SBC: Multi Phase Technologies LLC            Topic: 06

    78301S One of the most widely used geophysical methods for monitoring flow within the shallow subsurface is Electrical Resistively Tomography (ERT). The latest generation of ERT systems can monitor data to a precision of around 1%, allowing in situ changes to be interpreted within a few percent. In turn, subsurface temperature changes can be monitored to within a few degrees Centigrade, low lev ...

    SBIR Phase I 2005 Department of Energy
  7. Soil and Subsurface Contaminant Sensor System Based on Self-Sensed Microcantilever Arrays

    SBC: NEVADA NANOTECH SYSTEMS, INC.            Topic: 06b

    78644S The widespread use of mercury (Hg) in products, along with the equally widespread release of mercury to the environment as a result of manufacturing operations, presents a serious health risk. Mercury contamination is also a significant issue at several government sites, ranging from trace contamination to extremely high contamination of soils and sediments. There is therefore a great ne ...

    SBIR Phase I 2005 Department of Energy
  8. Ferroelectric Switch for a High-Power Ka-Band Active Pulse Compressor

    SBC: Omega-P, Inc.            Topic: 37

    78276S Sources of high-peak-power millimeter-wave radiation are needed for development and testing of components and structures for a future multi-TeV electron-positron collider. A pulse compressor must generate the 200 MW pulses needed to develop structures for the CERN two-beam accelerator, or for a similar high-gradient millimeter-wave accelerator. This project will develop high-power switch ...

    SBIR Phase I 2005 Department of Energy
  9. High-Power Ka-Band Window and Resonant Ring

    SBC: Omega-P, Inc.            Topic: 37b

    78728 A stand-alone 200 MW radio frequency (RF) test station is needed for developing accelerator structures and components for a future high-gradient multi-TeV collider, such as CLIC. In addition, a high-power RF window will be needed to isolate the test station from a structure element under test. This project will develop such a window for use in the frequency range 30-35 GHz, along with a h ...

    SBIR Phase I 2005 Department of Energy
  10. 20-MW Magnicon for ILC

    SBC: Omega-P, Inc.            Topic: 37b

    78413SThe international high-energy physics community has decided to develop superconducting radio frequency (RF) technolgy to be the basis for the International Linear Collider, a 0.5 - 1.0 TeV electron-positron collider that is intended to complement the Large Hadron Collider. The 1.3 GHz RF power needed to drive this accelerator is now planned to be supplied by 600-1200, 10-MW peak power multi ...

    SBIR Phase I 2005 Department of Energy
US Flag An Official Website of the United States Government