You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Virtual Receiving Antenna

    SBC: Delfin Systems            Topic: N/A

    The Phase I technical objective is to design a small "virtual" receiving antenna which will operate in the HF, VHF, and UHF frequency ranges (approximately 1 MHz to 1500 MHz) and then to build and test a laboratory prototype. The virtual antenna will be capable of duplicating electrically, but not physically, the wide variety of antennas necessary to receive HF, VHF, and UHF signals. The virtual a ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  2. Miniature RF Receiving Antennas

    SBC: Delfin Systems            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  3. Very Shallow Water Mine Countermeasures Diver Sonar-Lidar Sensor

    SBC: Hendrickson & Associates            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  4. Advanced Combat Rubber Raiding Craft (Small) Design and Development

    SBC: Kepner Plastics Fabricators,            Topic: N/A

    The objective of this study is to design an advanced inflatable boat that will meet the special needs of U.S. Navy SEALs and be deployable from a submerged submarine in hostile waters. For "Stealth", radar, sonar, infra-red and audio signatures will be suppressed by incorporating features such as hydrodynamic shaping to minimize wake and spray generation and by selecting materials and structures h ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  5. Advanced Combat Rubber Raiding Craft

    SBC: Merlin Technologies, Inc            Topic: N/A

    This proposal develops design details and materials concepts for a Collapsible Rigid Inflatable Boat (C-RIB). The proposal seeks to develop a seaworthy prototype within Phase I budgets and time- frames. A multi-disciplined team approach will develop a lightweight, armored, low observable craft launchable from submarines, aircraft, and surface vessels. Commercial versions are contemplated in collap ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  6. Very Shallow Water Mine Neutralization

    SBC: Pda Engineering            Topic: N/A

    One mission of the Naval Special Warfare forces is both location and neutralization of very shallow water anit-invasion mines. This proposal addresses the mine neutralization aspect of the problem. PDA has been developing high speed underwater rockets and projectiles for the past six years for the Navy, primarily under the sponsorship of the Naval Undersea Warfare Center (NUWC). The performance of ...

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  7. Small Virtual Receiving Antenna

    SBC: Walter Gee & Associates, LLC            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseSpecial Operations Command
  8. Infared Signature Suppression

    SBC: Sparta, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseSpecial Operations Command
  9. Fuzzy Logic Control for High Performance Batteries

    SBC: US NANOCORP, INC.            Topic: N/A

    Accurate battery state of charge (SOC) measurements and reserve power capacity measurements are cirtical for Special Operation Force (SOF) operators who use portabel battery-powered equipment in the field. Development of a reliable SOC determnation method would have broad dual use application in both the Military and private sector. US Nanocorp (USN) is collaborating with Villanova University's ...

    SBIR Phase I 1996 Department of DefenseSpecial Operations Command
  10. Slowdown, goddammit

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N/A

    Early in Phase I of this project we begin testing and can deliver a n extremely flexible prototype helmsman's vertical acceleration display and recording system. This low cost marinized PC based device can present acceleration historiesof any position of the boat in multiple formats on a high resolution sunlight readable display. Like an aircraft "black box", but with more memory, it can archive ...

    SBIR Phase I 1997 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government