You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Enhance Security and Improve Resilience in Embedded Systems for Space Force Satellites (ESPRESSO)
SBC: TRUSTED SCIENCE AND TECHNOLOGY, INC. Topic: AF19AT013Trusted Science and Technology, Inc. (Trusted ST) forms a strong team with academic partner and proposes to develop the solution called Enhance Security and Improve Resilience in Embedded Systems for Space Force Satellites (ESPRESSO). The project aims to provide a flexible, tailorable embedded system solution with enhanced security and resilience for reliable space mission support via cyber-harden ...
STTR Phase II 2023 Department of DefenseAir Force -
Test and Evaluation of Networked Environment and Corrosivity Monitoring
SBC: LUNA LABS USA LLC Topic: AF21ATCSO2The C-130 Hercules Transport Aircraft is subjected to a wide range of environmental severities, and schedule-based corrosion maintenance processes are insufficient to optimize corrosion management for individual aircraft. Improved corrosion management ca
STTR Phase II 2023 Department of DefenseAir Force -
An Adaptable, Cost-Effective, Real-Time 3D Vision System for Advanced Manufacturing
SBC: KRTKL INC. Topic: AF21ATCSO2Accurate, high-performance 3D vision frameworks will play a key role in the development of advanced manufacturing. These systems will employ the use of powerful data feature extractors such as deep neural networks (DNNs). However, in terms of size, latenc
STTR Phase II 2023 Department of DefenseAir Force -
Tool-Condition-Monitoring System for Surface-Integrity-Adaptive Milling and Repair
SBC: HILL ENGINEERING LLC Topic: AF21ATCSO2Conventional “subtractive” machining is a huge industry with critical implications for USAF and DOD. The vast majority of safety-critical parts are manufactured using subtractive machining because it produces excellent dimensional tolerance and a high-qua
STTR Phase II 2023 Department of DefenseAir Force -
Radio Frequency Imaging for Security and Inspection
SBC: SPECTROHM, INC Topic: AF20CTCSO1The specific technical problem/opportunity addressed in Phase I is the DAF needs to know what is inside suspicious objects, but seeing is not the same as identifying. No current technology can economically do both, as X-rays only see shapes, and modern th
STTR Phase II 2023 Department of DefenseAir Force -
Autonomous Robotic Coating for Thermal Protection Systems (ARCT)
SBC: CANOPY AEROSPACE, INC. Topic: X22DOTCSO1The commercial development of Thermal Protection Systems (TPS)- the material that protects spacecraft and hypersonic vehicles from extreme heat-has suffered a decade-long innovation drought after the conclusion of the NASA Space Shuttle Orbiter program in
STTR Phase II 2023 Department of DefenseAir Force -
Low-Loss Diodic Injectors with Rapid External Mixing for Hypersonic and Detonation Propulsion Systems
SBC: SPECTRAL ENERGIES LLC Topic: X22DOTCSO1Historically, space launches have required years of preparation and few options have existed for responding to on-orbit needs. The United States Space Force (USSF) is committed to overcoming these barriers with tactically responsive space vehicles that pr
STTR Phase II 2023 Department of DefenseAir Force -
Manufacture of Accurate, Dual-Sided, Capacitive Sheets (1023-002-002)
SBC: SI2 TECHNOLOGIES, INC Topic: AF21ATCSO2SI2 Technologies, Inc. (SI2), with support from the Jordan Valley Innovation Center (JVIC), proposes to accelerate optimization of its digital process for manufacturing printed, dual-sided capacitive sheets (C-Sheets). The proposed effort will help to ma
STTR Phase II 2023 Department of DefenseAir Force -
Elevated Autonomous Rescue Signal and Antenna (EARSA)
SBC: Battle Sight Technologies LLC Topic: X22DOTCSO1The rescue of isolated personnel is significantly hampered by the limitations of signaling devices in fauna defined landscapes. Beacons, smoke, and flares are unable to penetrate dense vegetation canopies effectively and heavy overgrowth limits line-of-si
STTR Phase II 2023 Department of DefenseAir Force -
RF-silent Voltage Regulators for Extreme Environments using AlInGaP Optocouplers
SBC: Polaris Semiconductor LLC Topic: X22DOTCSO1DC voltage regulators are crucial DC power management components in practically all modern defense electronics. Next generation satellite payloads require voltage regulators with state-of-the-art SWaP, electromagnetic interference (EMI) attributes, as wel
STTR Phase II 2023 Department of DefenseAir Force