You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. 3D-Printed Solid-State Reserve Microbatteries

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: A214008

    There is an ever-growing need for increased reserve battery performance in high power and volume-constrained applications over a wider range of temperatures. This small business innovation research project is aiming to address the issues of the current reserve batteries: 1) development of micro-scale reserve battery on-the-chip, 2) short life after activation of the current reserve batteries used ...

    SBIR Phase I 2021 Department of DefenseArmy
  2. Development of Novel Miniature Reserve Batteries on-the-Chip

    SBC: WASATCH IONICS LLC            Topic: A214008

    Redacted

    SBIR Phase I 2021 Department of DefenseArmy
  3. Ultra Lightweight Durable Aluminum Mortar Baseplate

    SBC: LOUKUS TECHNOLOGIES, INC.            Topic: A214006

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  4. Smart Minefield Detection/Clearance Mapping System

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A214014

    Redacted

    SBIR Phase I 2021 Department of DefenseArmy
  5. Multimodal Fused Face Recognition

    SBC: CYBERNET SYSTEMS CORPORATION            Topic: A214018

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  6. Attritable Radars for Contested Environments

    SBC: IMSAR LLC            Topic: A224017

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  7. High Energy Anodeless Battery for Unmanned Ground Vehicles and Beyond

    SBC: STORAGENERGY TECHNOLOGIES INC            Topic: A224017

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  8. Sustainable Geopolymer Concrete (GPC) using Indigenous and Waste Materials

    SBC: HIFUNDA LLC            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  9. M997A3 Chassis Suspension Improvements

    SBC: GS ENGINEERING INC            Topic: A224005

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  10. A224-006 Variable Speed Engine Cooling Fan

    SBC: GREAT LAKES SOUND & VIBRATION INC            Topic: A224006

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
US Flag An Official Website of the United States Government