You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development of enhanced active damping system for the Marine Corps Expeditionary Fighting Vehicle (EFV)

    SBC: MillenWorks            Topic: N04192

    To meet the Marines' need for high speed ship-to-shore and land mobility, the USMC Expeditionary Fighting Vehicle (EFV) is being equipped to provide a leap-ahead improvement over the capabilities of its predecessor, the 30-year old Amphibious Assault Vehicle (AAV). A critical component of improving the EFV's lethality and survivability is to greatly increase speeds across land. While the EFV's t ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  2. SPLASHGen: A Renewable Electrical Power Source for SOC-R Operations

    SBC: POWERIX TECHNOLOGIES, LLC            Topic: SOCOM05001

    This SBIR Phase-I effort proposes a novel, soldier-portable, low acoustic signature hybrid power generation system, SPLASHGen, which provides an alternative solution to the energy requirements of the SOCOM SOC-R mission. The proposed SPLASHGen technology is a parallel hybrid electric power system that uses a swing-engine-based power generation system that is augmented by a rechargeable battery pa ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  3. Velocity Sensing Sonar for Naval Special Warfare Undersea Vehicles

    SBC: RD INSTRUMENTS            Topic: SOCOM05003

    This Phase I proposal is to establish the feasibility of developing a velocity log suited to navigation of small underwater vehicles that are required to transit to the littoral zone from deeper open ocean waters during clandestine operations. The instrument will measure three components of bottom- and water-relative velocity over a wide altitude range of less than 1 to greater than 1000 m. It w ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
  4. Advanced Geospatial Computing

    SBC: REPLICUS SOFTWARE CORP.            Topic: NGA05001

    Our primary concept is a distributed storage system capable of supporting organizations which scale from the small to the very largest. The goal is to build a distributed self-configuring; self-managing and self-healing file storage system which exhibits modular upgradeability and dynamic adaptation to an organization's evolving needs. Our strategy to do this is to exploit a unique scientifically ...

    SBIR Phase I 2005 Department of DefenseNational Geospatial-Intelligence Agency
  5. Advanced Geospatial Computing

    SBC: TRUSTWORTHY SOFTWARE CORP.            Topic: NGA05001

    This proposal outlines the scope and prospective directions of research into the architecture, technology, methods and algorithms necessary for the building of the practically usable distributed system for dissemination, high-volume transportation, storage and management of large data files in heterogeneous world-wide networks, such as needed by the advanced geospatial computing. The specific topi ...

    SBIR Phase I 2005 Department of DefenseNational Geospatial-Intelligence Agency
  6. Unmanned Autonomous Vehicle Intelligence, Surveillance, and Reconnaissance (ISR) Payload Interface Master Module, PIMM

    SBC: VIPMobile, Inc.            Topic: SOCOM05005

    Significant advances have been made in sensor development, unmanned air platforms, and electronics system performance. However SOF tactical teams often do not receive near real time imagery intelligence and other sensor data relating to their area of operations. The objective of this project is to design and prove the feasibility of building a light weight, rugged, and low cost payload interface ...

    SBIR Phase I 2005 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government