You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Additive Manufacturing of All Solid-State Batteries with Novel Electrode Architectures
SBC: STORAGENERGY TECHNOLOGIES INC Topic: DTRA172005Supercapacitors have attracted considerable recent attentions due to their high-power density, and long cycle life. Unfortunately, the energy density of supercapacitors is too low to meet these applications requiring an energy supply for longer periods (hours or days). Storagenergy Technologies Inc. proposes to develop a superior all solid-state battery (ASSB) fabricated by additive manufacturing ...
SBIR Phase I 2018 Department of DefenseDefense Threat Reduction Agency