You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Reverse Engineering NSN 5985-01-519-6245

    SBC: MENTIS SCIENCES INC            Topic: DLA171002

    Aging military infrastructure is constantly in the need of replacement and upgrades. Competent and qualified domestic producers of these mission vital items are becoming increasingly scarce leading to fewer sources and less competition in the marketplace. To ensure that warfighters are properly equipped to perform their missions it is critical to have a reliable and sustainable supplier base wit ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  2. Algorithms for Look-down Infrared Target Exploitation

    SBC: SIGNATURE RESEARCH, INC.            Topic: 1

    Signature Research, Inc. (SGR) and Michigan Technological University (MTU) propose a Phase I STTR effort to develop a learning algorithm which exploits the spatio-spectral characteristics inherent within IR imagery and motion imagery.Our archive of modelled and labeled data sets will allow our team to thoroughly capture the variable elements that will drive machine learning performance.The overall ...

    STTR Phase I 2018 Department of DefenseNational Geospatial-Intelligence Agency
  3. Additive Manufacturing Process Monitoring and Control Technologies

    SBC: FLIGHTWARE INC            Topic: DLA181002

    The In Process Control for L-PBF (IPCL) program leverages and in process inspection method recently developed and successfully demonstrated for NASA. This Layer Topographic Map or LTM method measures the surface if every melt layer using a commercial laser profilometer. LTM software detects, locates and identifies flawed regions within a layer for every layer in the part. It does so for several co ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  4. Increase Product Availability And Improve Life Cycle Support For MILSATCOM System Components

    SBC: MENTIS SCIENCES INC            Topic: DLA182005

    Mentis Sciences Inc. (Mentis) proposes to develop a refurbishment program that is capable of disassembling, inspecting, and re-building complex systems and components, with the initial system of focus being the Minuteman Missile Antenna/Antenna Pedestal Assembly.To become a refurbishment supplier, Mentis will develop and adapt inhouse processes for performing refurbishment services by leveraging c ...

    SBIR Phase I 2018 Department of DefenseDefense Logistics Agency
  5. Tamper Resistant/Anti-Counterfeit Package Labeling

    SBC: H NU Photonics LLC            Topic: DLA163003

    The Defense Logistics Agency (DLA) top priority is warfighter support, and the DLA is firmly committed to a robust counterfeit mitigation strategy that protects our warfighters and the vital missions they perform. HNu Photonics, LLC (HNu) Color Holographic Quick Response (CHQR, pronounced “Checker”) technology combines RGB 3-layer QR codes with holographic imaging technology, and is as robust ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
  6. Reverse Engineering and Source Approval for Aerospace Components

    SBC: MENTIS SCIENCES INC            Topic: DLA171002

    Mentis Sciences Inc. proposes to develop Technical Data Packages and generate Source Approval Requests for critically needed components for the Air Launched Cruise Missile engine platform, the F107, which is no longer supported by the OEM. The supply of some spare parts may be exhausted as early as Oct 2018, on a system that is scheduled to remain in service through at least 2030.Mentis will work ...

    SBIR Phase II 2018 Department of DefenseDefense Logistics Agency
US Flag An Official Website of the United States Government