You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Digital Twin for Operational Resiliency (DTOR)
SBC: SENTAR, INC. Topic: DLA232004Digital Twins (DT) – computer simulations of electro-mechanical systems – have been employed for many years to monitor and predict the behavior of the physical systems they model. Since the introduction of malware such as Stuxnet, an urgent need has arisen to predict and prevent such operational technology (OT) systems from catastrophic critical infrastructure attacks before malicious cyber ac ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Azimuth Telescope Reverse Engineering and Manufacturing Design
SBC: NIELSON SCIENTIFIC LLC Topic: DLA232001This project will result in a new supplier for a specific azimuth telescope that is a critical component in existing Department of Defense systems. Currently, there is no existing supplier for the azimuth telescope and there is no technical or engineering information available for the azimuth telescope that could be used by a new supplier to begin manufacturing the azimuth telescope. To address th ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains (DLA232-001)
SBC: Beacon Industries, Inc. Topic: DLA232001Coupling, Shaft is a mechanical component used to connect two rotating shafts together, allowing the transmission of power and torque. It helps to minimize the effects of misalignment, vibration, and shock and reduces the stress and wear on the connected shafts and their bearings. The Coupling, Shaft (NSN 3010-01-679-7883) listed in Small Business Innovation Program website is an aviation critical ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains
SBC: Beacon Industries, Inc. Topic: DLA231001The Oshkosh M1070 is a US Army tank transporter tractor unit that is also used in the military for various operations and military drills. It is a powerful tractor truck with an 8x8 drive configuration and advanced features such as an electronic engine control system to ensure maximum efficiency at all times and an 'air ride' rear suspension to ensure all axles remain in contact with the ground ...
SBIR Phase I 2023 Department of DefenseDefense Logistics Agency -
High Energy Density Batteries
SBC: WASATCH IONICS LLC Topic: SOCOM232003Soldiers conducting missions on foot in remote locations must carry multiple battery powered electronic devices, such as multiband radio sets, night vision goggles and scopes, GPS tracking, thermal imagers, target designators, etc. These devices allow soldiers to target, move, and communicate in the modern battlefield. Depending upon the type of mission and its duration, soldiers might not have th ...
SBIR Phase I 2023 Department of DefenseSpecial Operations Command -
Formable Preform for Advanced Ceramic Matrix Composite Structures
SBC: PEPIN ASSOCIATES INC Topic: DLA23A003Pepin Associates, Inc. has developed a unique, aligned discontinuous textile reinforcement for composite structures. This reinforcement architecture is composed of short, overlapped tow segments. The architecture allows the textile to stretch in its reinforcement direction. This ability permits rapid fabrication of complex shaped thermal protection system structures from simple low cost sh ...
STTR Phase I 2023 Department of DefenseDefense Logistics Agency -
Cost Effective TPS Technology for Hypersonic Applications
SBC: RUSSELL TECHNICAL CONSULTING SERVICES LLC Topic: DLA23A003The focus of this proposed Phase I STTR will be on identifying and assessing initial low-cost acreage TPS technologies applicable to hypersonic conventional and strategic system performance objectives addressing affordability, capacity, and supply chain resilience. The initial feasibility assessment will utilize a low-cost TPS technology, carbon phenolic, and assess performance over a range of n ...
STTR Phase I 2023 Department of DefenseDefense Logistics Agency -
Engaging the Manufacturing Industrial Base in Support of DLA’s Critical Supply Chains
SBC: Beacon Industries, Inc. Topic: DLA222001Beacon Industries Inc., an ITAR Compliant woman owned small business continuously operating since 1948, proposes to improve both product availability and increased competition through the development of a complete Technical Data Package (TDP) for NSN 3020-01-294-7175 ( Spur Gear ) with the utilization of government-provided technical data or through reverse inspection & engineering tec ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
Direct Production of Coal Tar Pitch
SBC: COMBUSTION RESOURCES PARTNERS LLC Topic: DLA222006Direct Production of Coal Tar Pitch Technical Abstract The increased attractiveness of carbon composites, in particular carbon/carbon composites, to the aerospace industry requires abundant, domestic and secure sources of pitch. With its high carbon content and resulting density advantages coal-based pitch is of prime interest. The ability to produce coal-based pitch from a wide-variety coals, eve ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency -
MagWerks Lamps for Drop-in Energy Efficient Vehicular Lighting
SBC: MAGWERKS VISION INC. Topic: DLA222002MagWerks Vision Inc. will perform a feasibility study for their vehicular lighting system as it applies to the B-52H bomber aircraft. Through this phase I effort, MWV aims help the Air Force achieve its goal of “resiliency and redundancy” by designing, testing, and validating its lighting solution for application to Air Force aircrafts, specifically the B-52H (af.mil). The expectation is th ...
SBIR Phase I 2022 Department of DefenseDefense Logistics Agency