You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. CAM+: A Rugged Modular Digital Camera System

    SBC: DESERT STAR SYSTEMS, LLC            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseSpecial Operations Command
  2. N/A

    SBC: EDCO, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseSpecial Operations Command
  3. Day/Night Miniature Sighting System for Handheld Weapons

    SBC: Irvine Sensors Corporation            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseSpecial Operations Command
  4. Remote Sighting System for Weapons

    SBC: LANDTEC, INC.            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseSpecial Operations Command
  5. ATES: Advanced Technology Exposure Suit

    SBC: Mide Technology Corporation            Topic: N/A

    N/A

    SBIR Phase I 1999 Department of DefenseSpecial Operations Command
  6. N/A

    SBC: REYNOLDS SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseSpecial Operations Command
  7. N/A

    SBC: SIERRA MONOLITHICS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseSpecial Operations Command
  8. N/A

    SBC: Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseSpecial Operations Command
  9. N/A

    SBC: Tacan Corp            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseSpecial Operations Command
  10. Advanced Lightweight Aviation Components and Materials

    SBC: GS ENGINEERING INC            Topic: SOCOM07001

    The A/MH-6M Mission-Enhanced Little Bird (MELB) serves the roles of light attack (AH-6M) and light assault/transport/reconnaissance (MH-6M) helicopters.As such, critical characteristics include overall nimbleness, payload capacity, range, time on station, transit time, and component life/safety margin.Keeping pace with operators desire for improvement of these characteristics is critical for the p ...

    SBIR Phase II 2018 Department of DefenseSpecial Operations Command
US Flag An Official Website of the United States Government