You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: 941DIn the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Developing a Standard Integrated Framework for Transit Assest Management Information
SBC: Encada LLC Topic: 131FT2Transit Agency Information required for managing Service centers on resources and assets that need to be available to operate the transit service as designed. An opportunity exists to design an Integrated Framework providing Service delivery and Maintenance Management Information to quantify the reliability and availability of the assets. This framework will incorporate modeling of the asset inven ...
SBIR Phase I 2013 Department of Transportation -
Creating Spatial Disorientation in Flight Simulation
SBC: CONTINUUM DYNAMICS INC Topic: 122FA1Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...
SBIR Phase I 2013 Department of Transportation -
UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.
SBC: CONTINUUM DYNAMICS INC Topic: N/AUNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...
SBIR Phase I 1985 Department of Transportation -
INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEM SIMULATION- IEMS(3)
SBC: Data Communications Corp. Topic: N/ATHE PURPOSE OF THIS RESEARCH PROJECT IS TO DETERMINE THE FEASIBILITY OF MERGING AN EMERGENCY MEDICAL SERVICES (EMS) SIMULATOR WITH GEOGRAPHICAL INFORMATION SYSTEMS (GIS) IN ORDER TO PRODUCE IEMS(3) (INTELLIGENT EMERGENCY MEDICAL SERVICES SYSTEMS SIMULATOR), A PC-BASED SYSTEM WHICH CAN BE USED FOR BOTH ADDRESSING STRATEGIC PLANNING ISSUES OF EMS SYSTEMS (E.G., SYSTEM CONFIGURATION; VEHICLE LOCATION ...
SBIR Phase I 1994 Department of Transportation -
POWDER SYSTEM
SBC: Energy & Minerals Research Topic: N/ATWO YEARS AGO IT WAS EXPERIMENTALLY SHOWN THAT CHARGED WATERDROPLETS COULD KNOCK-DOWN SMOKE RAPIDLY. WE NOW PROPOSE TO TO DEVELOP A DEVICE WHICH USES A CHRGED FINELY POWERED SOLIDAEROSOL TO KNOCK-DOWN SMOKE. USING A SOLID INSTEAD OF A LIQUID AEROSOL HAS SIGNIFICANT ADVANTAGES. THE SOLID PART ICLES CAN BE PRE-FORMED IN A READY-TO-USE STATE. PARTICLE SIZE CAN BE RIGOROUSLY CONTROLLED AND HAVE OPTIMU ...
SBIR Phase I 1985 Department of Transportation -
DUE TO THE IMPROVED MECHNICAL PROPERTIES AND DURABILITY OF POLYMER CONCRETE MATERIALS, THERE IS A LOT OF INTEREST IN INTHE HIGHWAY COMMUNITY FOR USE OF THESE MATERIALS FOR PAV PAVEMENT APPLICATIONS.
SBC: Pahdalai Coatings Co. Topic: N/ADUE TO THE IMPROVED MECHNICAL PROPERTIES AND DURABILITY OF POLYMER CONCRETE MATERIALS, THERE IS A LOT OF INTEREST IN INTHE HIGHWAY COMMUNITY FOR USE OF THESE MATERIALS FOR PAV PAVEMENT APPLICATIONS. BUT THERE IS NO INFORMATION AVAILABLEABOUT ITS APPLICATION FOR AIRPORT RUNWAY USE. PANDALAI COATINGS COMPANY PROPOSES TO TAKE UP A STUDY OF POLYMER CONCRETE MATERIALS TO EVALUATE ITS FEASIBILITY AS AN ...
SBIR Phase I 1985 Department of Transportation -
ADVANCED ACOUSTIC EMISSION TECHNIQUES FOR TANK CAR WELD INSPECTION
SBC: PHYSICAL ACOUSTICS CORP. Topic: N/AACOUSTIC EMISSION CAN DETECT FLAWS IN TANK CARS WITHOUT REMOVAL OF LINING OR INSULATION. THIS RELATIVELY NEW METHOD HAS ALREADY BEEN USED SUCCESSFULLY ON ABOUT 10,000 CARS. HOWEVER, THERE HAVE BEEN SOME SHORTCOMINGS IN THE AREAS OF RELIABILITY AND INTERPRETATON. THIS PROJECT WILL ADDRESS AND CORRECT THESE SHORTCOMINGS WITH NEW RESEARCH AND REFINED TECHNIQUES FOR THE AE TEST. THE FIRST AREA OF RESE ...
SBIR Phase I 1994 Department of Transportation -
X-RAY DAMAGE THRESHOLD FOR FILM AND MAGNETIC RECORDING MEDIA
SBC: United Dynamics, Inc. Topic: N/ATHE FEDERAL AVIATION ADMINISTRATION NEEDS STATISTICAL DATA ON THE X-RAY DAMAGE THRESHOLD OF PHOTOGRAPHIC FILM AND MAGNETIC MEDIA TO PREDICT POSSIBLE DAMAGING EFFECT OF HIGHER POWERED X-RAY FACILITIES BEING CONSIDERED AS PART OF INCREASED AIRPORT SECURITY. TECHNOLOGY DEVELOPMENT ASSOCIATES, INC. (TDA) PROPOSES AN EXPERIMENTAL PROGRAM TO STATISTICALLY EVALUATE DAMAGE THRESHOLDS. X-RAY TRANSPORT ANAL ...
SBIR Phase I 1994 Department of Transportation -
DIFFERENTIALLY DRIVEN GENERATORS (DDG)
SBC: Transmission Technology Co Inc Topic: N/ATRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...
SBIR Phase I 1985 Department of Transportation