You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS
SBC: Computer Technology Associates Topic: N/AN/A
SBIR Phase I 1986 Department of Transportation -
Microwave NDT of Cracks in Structural Metals
SBC: Raymond & Lae Engineering, Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR
SBC: Ophir Corporation Topic: N/AN/A
SBIR Phase I 1986 Department of Transportation -
THIS PROPOSAL DESCRIBES THE NOVEL CONCEPT OF USING INNOCUOUSENERGY SOURCES TO ENHANCE THE DESORPTION, FROM CLOTHING SURFACES, OF CHEMICAL VAPORS ASSOCIATED WITH EXPLOSIVES.
SBC: First Omega Group Inc Topic: N/ATHIS PROPOSAL DESCRIBES THE NOVEL CONCEPT OF USING INNOCUOUSENERGY SOURCES TO ENHANCE THE DESORPTION, FROM CLOTHING SURFACES, OF CHEMICAL VAPORS ASSOCIATED WITH EXPLOSIVES. THEFIRST OMEGA GROUP, INC. PROPOSES TO DEMONSTRATE THE SUIT- ABILITY OF THIS CONCEPT WHICH WOULD ENABLE THE CONSTRUCTION OF EQUIPMENT THAT CAN BE LOCATED AT AIRPORT PASSENGER SCREENING AREAS. THE DEVICE IS EXPECTED TO ENCOURAGE ...
SBIR Phase I 1986 Department of Transportation