You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Highway Capacity Software in Portable Graphical User Interface (GUI) Format
SBC: Catalina Engineering, Inc. Topic: N/AThe Highway Capacity Software (HCS) has, for the past 10 years, been the principal tool for applying the analysis methods of the Highway Capacity Manual (HCM). The HCS has been DOS-based with a very limited user interface. With a number of new research materials being produced, and an approved plan in place which leads to publication of an HCM 2000 and accompanying software, there is a strong op ...
SBIR Phase II 1998 Department of Transportation -
Remote Sensors for Pavement Ice Detection
SBC: INNOVATIVE DYNAMICS INC. Topic: N/AN/A
SBIR Phase II 1998 Department of Transportation -
Addressing the Driving Needs of Short Stature Persons
SBC: SAFE INC Topic: 04NH1Phase I research on the development of a supplemental seating system for short stature drivers was undertaken by Safe Inc. in 2005. The purpose of Phase I was to demonstrate the feasibility of a device that would improve the ability of short stature drivers to safely operate a motor vehicle and to improve occupant crash safety. The study sought to examine the use of pedal extenders and other imp ...
SBIR Phase II 2008 Department of Transportation -
Environmentally Neutral Electric Bike Share System
SBC: INNOVATIVE DYNAMICS INC. Topic: 142OS1IDI is proposing an electrically assisted e-bike system, designed to increase the usage of bicycles for daily commuting. This design is intended for usage alongside traditional bike share programs in cities across the country. The primary benefit is attract those otherwise unwilling to use bicycles to commute, either due to personal reservation or perceived terrain difficulties. This is accomplish ...
SBIR Phase II 2016 Department of Transportation -
Development of Light-Weight, Low-Cost Multichannels Membrane Reformer
SBC: ATS-MER, LLC Topic: N/AA novel approach for the development of a lightweight, low-cost, compact, and quick start-up on-board fuel reformer is proposed in this Phase II program. The approach is based on a novel MER¿s technique for the fabrication of multichannel mini-reactors incorporating hydrogen separating membrane. Multichannel mini-reactor shrinks the dimensions through which energy and reactants travel to their ...
SBIR Phase II 2001 Department of Transportation -
PDA-Based Portable Data Collection System for Commercial Vehicle Inspection
SBC: INTERNATIONAL ELECTRONIC MACHINES CORPORATION Topic: 02FM1More than 1,300,000 Level 1 commercial vehicle inspections - a safety-critical, time-consuming, often difficult and painstaking process, especially as regards the brake inspection component -- are performed every year in the United States, under all sorts of weather and lighting conditions. The current technology used adds to the complexity and error potential inherent in this important task. In ...
SBIR Phase II 2008 Department of Transportation