You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A New Nanocomposite Rubber Liner for Tires

    SBC: TDA RESEARCH, INC.            Topic: N/A

    Halobutyl rubber is used as an inner liner for tubeless automotive tires because of its low permeability to gases and good compatibility with other tire materials. However, at high pressures and over prolonged time periods, tires leak. Factors such as under-inflation and heat are major contributors to tire damage. While the tires are slowly losing air pressure, consumers also do not maintain c ...

    SBIR Phase I 2001 Department of Transportation
  2. Microscopic Traffic Flow Simulation Models- An Open Source Approach

    SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION            Topic: 081FH5

    In the Open-source microscopic traffic simulation models project, a component based software framework is proposed to re-engineer CORISM data struture and CORISM interface. Under the architecture combing the innovative framework and the legacy CORISM, prototype of the open source traffic flow simulation models will be developed and demonstrated in the Phase I. In addition, areas identified by th ...

    SBIR Phase I 2008 Department of Transportation
  3. Recycling of Portland Cement Concrete

    SBC: Road Processing Resources Inc.            Topic: N/A

    This proposal is to investigate a concept of a shock producing component that will be the basis of a machine to remove deteriorated concrete pavement. The principal has been proven feasible, but further demonstration has to be accomplished to proceed with application and expense of continued development of a Road Remover/Recycler. This machine will move continuously on a lane width of pavement a ...

    SBIR Phase I 2001 Department of Transportation
  4. Software Package for Material Model Evaluation

    SBC: APTEK, Inc.            Topic: N/A

    This Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...

    SBIR Phase I 2001 Department of Transportation
US Flag An Official Website of the United States Government