You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Calibration of an Autonomous Navigation System Using GPS and Machine Learning
SBC: Sierra Nevada Corporation Topic: N/AGPS receivers are heavily used in aviation for both visual and instrument flights. There is a need for a backup system so that enroute and non-precision approaches can be flown without reliance on ground based systems should GPS be unavailable. We propose to use barometric pressure, airspeed, low-cost inertial sensors, three-axis magnetometer along with high-fidelity geomagnetic models, and an ...
SBIR Phase I 2001 Department of Transportation -
Microscopic Traffic Flow Simulation Models- An Open Source Approach
SBC: NEW GLOBAL SYSTEMS FOR INTELLIGENT TRANSPORTATION MANAGEMENT CORPORATION Topic: 081FH5In the Open-source microscopic traffic simulation models project, a component based software framework is proposed to re-engineer CORISM data struture and CORISM interface. Under the architecture combing the innovative framework and the legacy CORISM, prototype of the open source traffic flow simulation models will be developed and demonstrated in the Phase I. In addition, areas identified by th ...
SBIR Phase I 2008 Department of Transportation -
Public Rights-of-Way Assessment Instrumentation to Determine Accessibility
SBC: BENEFICIAL DESIGNS INC Topic: N/ACities must perform detailed assessments of sidewalks and streets, including curb ramps, pedestrian signals, crosswalks, street furniture, and other components to determine compliance with the Public Rights-of-Way Accessibility Guidelines. However, current assessment methods are inadequate or unreasonable due to time and resources required. The objectives of this project are to: 1) develop elect ...
SBIR Phase I 2008 Department of Transportation