You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. PLI Response to DLA232-001 NSN 5935-00-459-9640

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5935-00-459-9640, Connector, Receptacle, Electrical. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by a ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  2. PLI Response to DLA232-001 NSN 5330-00-242-6875

    SBC: PARTS LIFE INC            Topic: DLA232001

    Parts Life, Inc. is proposing to improve product availability and increase competition through the development of a Source Approval Requests (SAR) for 5330-00-242-6875 Seal, Plain Encased. Parts Life, Inc. will conduct relevant research and reverse engineering resulting in the development of the technical data package (TDP) as well as a SAR. The intent is that upon SAR approval by an ESA, Parts Li ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  3. Multimode IR/RF Surrogate Seeker

    SBC: EPISENSORS INC            Topic: N232088

    A passive multimode IR and RF sensor fusion platform in a missile seeker guidance system would greatly benefit a missile’s capabilities in tracking and locking to a target. The strengths of RF and IR somewhat complement each other and the use of both can greatly increase the system’s ability to react to current countermeasures by independently selecting a disaffected sensor’s data to follow. ...

    SBIR Phase I 2023 Department of DefenseNavy
  4. HOT Dual-Band (eSWIR/MWIR) T2SL Camera

    SBC: EPISENSORS INC            Topic: A234013

    Redacted

    SBIR Phase I 2023 Department of DefenseArmy
  5. AeroLite Sense: Atmospheric Aerosols and Particulates Observations from the Stratosphere

    SBC: STRATOSOLUTIONS INC            Topic: 91

    The long endurance “StratoSonde” lighter-than-air, uncrewed system combines a low-cost, 5day endurance StratoSonde supports up to 10 micro-dropsondes, which when released from the HAB, descend safely through the entire atmospheric column under a ribbon drogue while reporting observations directly back to the HAB. This project will assess the feasibility of integrating a disposable miniature ae ...

    SBIR Phase I 2023 Department of CommerceNational Oceanic and Atmospheric Administration
  6. Source Approval Request (SAR) Package and Development Plan for Battery Connector Assembly NSN 6150-01-629-3728

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6150-01-629-3728, a Battery Connector Assembly. This battery connector assembly is out of stock at two different suppliers (but available at a third supplier, please see below in Figure 6-1), and the NSN pertains to F-15C and F-15D based platforms including variants currently flown by some ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  7. Source Approval Request (SAR) Package and Development Plan for Radio Cable Assembly NSN 5995-11-959-918

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 5995-01-195-9918, a Radio Cable Assembly for the B-1 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities rela ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  8. Source Approval Request (SAR) Package and Development Plan for Generator Rack NSN 6110-10-733-343

    SBC: Kaney Aerospace, Inc.            Topic: DLA231001

    Kaney Inc. (Kaney) proposes development of a SAR package and development plan for National Stock Number (NSN) 6110-01-073-3343, a Generator Rack for the C-130 platform. During Phase I, Kaney will utilize our in-house manufacturing and analysis capabilities to develop Kaney drawings and a manufacturing/qualification plan for this part. Kaney has extensive domain knowledge and capabilities related ...

    SBIR Phase I 2023 Department of DefenseDefense Logistics Agency
  9. LOS And BLOS navY Radio INTerface (LABYRINTh)

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: N231024

    MaXentric will develop an architecture which can disseminate Minotaur Family of Services (MFoS) data using the ARC-210 UHF capability as the transport segment.  The solutions must be capable of direct line of sight (LOS) as well as beyond LOS (BLOS) communication between system nodes.  MaXentric will evaluate the RF communications segment using modeling and simulation to ensure any candidate sys ...

    SBIR Phase I 2023 Department of DefenseNavy
  10. Broadband Amplifier Source with Innovative LRU-based Integration using Solid-state for Kilowatt-outputs (BASILISK)

    SBC: MAXENTRIC TECHNOLOGIES LLC            Topic: N231062

    Navy ONR is seeking the design of an efficient wideband high-power amplifier using solid state technologies.  In response, MaXentric proposes Broadband Amplifier Source with Innovative LRU-based Integration using Solid-state for Kilowatt-outputs (BASILISK). The project will investigate how to design a 2-kW peak power solid state amplifiers with 70% efficiency and up to a 50% duty cycles. Combiner ...

    SBIR Phase I 2023 Department of DefenseNavy
US Flag An Official Website of the United States Government