You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS
SBC: Gourary Assoc Inc Topic: N/ATHE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...
SBIR Phase I 1987 Department of Transportation -
Feasibility Assessment of an Intelligent System for Real-Time Prediction of Railway Vehicle Response to the Interaction with Track Geometry
SBC: Zeta-Tech Associates, Inc. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation