You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. VAPOR COATING OF BORON FUEL PARTICLES BY MAGNESIUM

    SBC: Aerochem Research            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseNavy
  2. High Bandwidth Optoelectronic Data Interfaces for Satellites

    SBC: ALPHION CORP.            Topic: AF04043

    This SBIR Phase I project proposes the feasibility study of integrated all-optical 2R regeneration and 3R optical signal regeneration devices for use as high-speed interfaces in satellite applications (solicitation AF04-043). Currently available products achieve regeneration of signals by resorting to Optical to Electrical and then Electrical to optical conversion (OEO), which results in costly, ...

    SBIR Phase I 2004 Department of DefenseAir Force
  3. HIGH DYNAMIC RANGES MIXERS

    SBC: Anadigics Inc            Topic: N/A

    HIGH DYNAMIC RANGE MIXERS ARE BECOMING MORE IMPORTANT AS THE COMPLEXITY OF THE ELECTRONIC WARFARE SYSTEMS INCREASE. SINCE IT IS USUALLY THE FIRST OR SECOND DEVICE FROM THE RF INPUT, THE PERFORMANCE OF THE MIXER IS CRITICAL IN THE OVERALL OPERATION OF THE SYSTEM. THE DESIGN OF THE PRESENT DAY MIXERS IN THE MILLIMETER WAVEBANDS ARE BASED ON SCHOTTKY BASED DIODES IN THE SELF BIAS MODE AND ADVANCEMENT ...

    SBIR Phase I 1988 Department of DefenseAir Force
  4. Advanced Gel Bipropulsion Tank System

    SBC: ARDE, INC.            Topic: A03154

    Development of three Bipropellant Tank designs with mechanically linked pistons for Advanced Small Missile Systems. The study will consider the technical and fabrication issues associated with the design, and rate the comparative merits leading to the selection of Phase II continuation.

    SBIR Phase I 2004 Department of DefenseArmy
  5. AN INVESTIGATION OF NEW METHODS TO GENERATE AN ANTHROPOMETRIC DATABASE AND TO RESOLVE GARB FIT PROBLEMS

    SBC: Arkline Research            Topic: N/A

    THE PURPOSE OF THE EFFORT PROPOSED HEREIN IS TO DEFINE THE PROCEDURES TO ESTABLISH AN ANTHROPOMETRIC DATABASE WHICH CAN BE ADDED TO ON A CONTINUOUS BASIS, AND WHICH WILL PROVIDE THE INFORMATION NEEDED BY VARIOUS USERS IN ORDER TO GUARANTEE THE FIT OF GARB WORN BY MILITARY PERSONNEL. TO MEET THAT END, SPECIFIC FIT PROBLEMS WILL BE STUDIED IN ORDER TO DETERMINE THEIR CAUSE. BY EXPERIENCED AND SPECIA ...

    SBIR Phase I 1988 Department of DefenseAir Force
  6. Land Mine Detection by Time Reversal Acousto-seismic Method

    SBC: ARTANN LABORATORIES, INC.            Topic: A03107

    The objective of the proposed research is to develop new technologies based on principles of Time Reversal Acoustics (TRA) that will provide highly sensitive land mine detection. We suggest applying the Time Reversal Acousto-seismic method in combination with a nonlinear acousto-seismic mine detection technique. The TRA focused system provides a high concentration of seismic wave energy at any des ...

    SBIR Phase I 2004 Department of DefenseArmy
  7. Skeletal Muscle Water Content Measurement Sensor/Tool

    SBC: ARTANN LABORATORIES, INC.            Topic: A03156

    The objective of this proposal is to develop a Muscle Water Content (MWC) sensor, an ultrasonic device for assessment of body hydration status in soldiers with accuracy better than 2% during deployment and training. The MWC assessment is based on measurement of ultrasound velocity in muscle, which is, to a good approximation, a linear function of the water content. The expected outcome will be ...

    SBIR Phase I 2004 Department of DefenseArmy
  8. Monolithic Integration of Photonic and Electronic Devices for High Performance EPICs (Electronic-Photonic Integrated Circuits)

    SBC: ASIP, INC.            Topic: SB041031

    In Phase 1 we will demonstrate the feasibility of integrating high-speed InP-based HEMTs with ASIP's proprietary asymmetric twin waveguide photonic integration technology. A common source HEMT driver transistor will be integrated with a simple, asymmetric twin waveguide (ATG) compatible laser. In Phase 2, we will extend this feasibility demonstration to demonstrate an EPIC consisting of a single ...

    SBIR Phase I 2004 Department of DefenseDefense Advanced Research Projects Agency
  9. HIGH TEMPERATURE SURVIVABLE CONTACTS FOR GALLIUM ARSENIDE SPACE SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
  10. ALUMINUM-GALLIUM-ARSENIDE TOP SOLAR CELL FOR MECHANICAL ATTACHMENT TO A SILICON CONCENTRATOR WITH IMPROVED AMO EFFICIENCY

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of DefenseMissile Defense Agency
US Flag An Official Website of the United States Government