  1. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  2. Comprehensive Operations and Planning Environment for Improving BRT Operations

    SBC: SIMWRIGHT, INC.            Topic: N/A

    Increasing BRT ridership using ITS requires a holistic approach that addresses overall system performance. ITS applications supporting bus rapid transit (BRT) are typically single purpose applications. These applications usually support one facet of transit/transportation activities, e.g. transit planning, transit operations/maintenance, or transit end users. These "stovepipe" applications gene ...

    SBIR Phase I 2004 Department of Transportation