You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines
SBC: Outside Plant Consulting Services, Inc. Topic: N/AThe feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...
SBIR Phase I 2004 Department of Transportation -
Comprehensive Operations and Planning Environment for Improving BRT Operations
SBC: SIMWRIGHT, INC. Topic: N/AIncreasing BRT ridership using ITS requires a holistic approach that addresses overall system performance. ITS applications supporting bus rapid transit (BRT) are typically single purpose applications. These applications usually support one facet of transit/transportation activities, e.g. transit planning, transit operations/maintenance, or transit end users. These "stovepipe" applications gene ...
SBIR Phase I 2004 Department of Transportation