You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Portable Electronic Composite Track Loading Fixture

    SBC: ADVANCED TECHNOLOGIES GROUP, INC.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  2. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  3. Automatic Vehicle Body Classification Using High-Resolution Laser RADAR

    SBC: Schwartz Electro-Optics, Inc            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
  4. Comprehensive Operations and Planning Environment for Improving BRT Operations

    SBC: SIMWRIGHT, INC.            Topic: N/A

    Increasing BRT ridership using ITS requires a holistic approach that addresses overall system performance. ITS applications supporting bus rapid transit (BRT) are typically single purpose applications. These applications usually support one facet of transit/transportation activities, e.g. transit planning, transit operations/maintenance, or transit end users. These "stovepipe" applications gene ...

    SBIR Phase I 2004 Department of Transportation
  5. Feasibility Assessment of an Intelligent System for Real-Time Prediction of Railway Vehicle Response to the Interaction with Track Geometry

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1998 Department of Transportation
US Flag An Official Website of the United States Government