You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
"Comparison of Moire Deflectometry and Projection Moire Techniques for Remote Sensing of Fatigue Cracks"
SBC: Gaea Technologies Topic: N/AN/A
SBIR Phase I 1995 Department of Transportation -
Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines
SBC: Outside Plant Consulting Services, Inc. Topic: N/AThe feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...
SBIR Phase I 2004 Department of Transportation -
Tectonite Mobile Quick Repair System
SBC: Warm Springs Composite Products Topic: N/AThis is a proposal for a new and innovative technology to perform quick, durable, and sustained repair of concrete and pavement structures with far less interference to transportation services and flow of traffic on highways than is possible with current materials, systems, and practices. The functional problem is that National Highwayt System consists of over 600,000 bridge structures and over 1 ...
SBIR Phase I 2004 Department of Transportation