You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Field Rail Welding with the Electroslag Welding Process

    SBC: EST&D LLC            Topic: 101FR5

    The two most frequently used field rail welding processes, thermite and flash-butt, have limitations. The thermite process, though less expensive and more portable, sometimes produces welds with inclusions which can limit short term quality and long term fatigue life. Flash-butt, which produces a very high quality weld, is not as portable as thermite. SBIR solicitation 10.1 FR5 requires a new w ...

    SBIR Phase I 2010 Department of Transportation
  2. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  3. Innovative Acoustic Source Location & Identification Methods for Railroad Tank Car Testing

    SBC: PHYSICAL ACOUSTICS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  4. Tectonite Mobile Quick Repair System

    SBC: Warm Springs Composite Products            Topic: N/A

    This is a proposal for a new and innovative technology to perform quick, durable, and sustained repair of concrete and pavement structures with far less interference to transportation services and flow of traffic on highways than is possible with current materials, systems, and practices. The functional problem is that National Highwayt System consists of over 600,000 bridge structures and over 1 ...

    SBIR Phase I 2004 Department of Transportation
  5. Innovative Solutions to Reduce Wheel/Rail Forces and Fatigue of Railroad Switch Frogs

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government