You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  2. Field Energy Recoil Emission Technology (FERET)

    SBC: INVOCON, INC.            Topic: N/A

    Passenger safety concerns have prompted the FAA to elicit energy-sensitive neutron detectors which do not rely on the time-of-flight method and are suitable for use in explosive detection systems. Invocon, Inc. proposes to design an inspection system consisting of an energy source and a detector. Designated FERET sytem, (Field Energy Recoid Emission Technology), it would detect substances identi ...

    SBIR Phase I 1996 Department of Transportation
  3. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  4. An Intermodal Operations Planning & Coordination System

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    This proposed activity will conduct case studies of six selected United States ports to determine whether an integrated terminal information system in each of them might deliver significant benefits to port operators, port users, and shippers. Using the experience of the railroad industry as a guide, problems and possibilities for integrating information flow will be examined. The final report w ...

    SBIR Phase I 1996 Department of Transportation
US Flag An Official Website of the United States Government