You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Detection of Internal Pipeline Corrosion Using a Wireless Sensor

    SBC: AGINOVA INC            Topic: 47

    75085-Internal corrosion of natural gas pipelines is a leading cause of pipeline failures, leading to product losses as well as injuries and fatalities. Although in-line inspection tools are presently utilized, 30 percent of natural gas pipelines are not accessible to these tools, and internal corrosion is not detected in real time. This project will develop a wireless sensor network to detect t ...

    SBIR Phase I 2004 Department of Energy
  2. Advanced Fluoropolymer Vessels for Ultra-Clean Ionization and Scintillation Detectors

    SBC: Applied Plastics Technology, Inc.            Topic: 8

    75336-A broad category of experiments in astro-particle and high energy physics requires the construction of ultra-high-purity and ultra-low-radioactive-background, cubic-meter-scale vessels to be used as containers for ionization and scintillation media. Double-beta decay experiments, solar neutrino experiments, and dark matter searches would all benefit from this technology. Plastics are among ...

    SBIR Phase I 2004 Department of Energy
  3. Membrane-Based Hybrid Process to Capture CO2 from Warm Flue Gas

    SBC: Chembrane            Topic: 45

    75772-Most coal-based power plants use pulverized coal boilers to generate superheated steam for turbine applications, accounting for over 50 percent of U.S. electricity generation. The flue gas stream from these plants contains carbon as CO2, along with N2 and other minor components such as SO2 and NOx. Although some commercial technologies are available to separate or capture the CO2 from the ...

    SBIR Phase I 2004 Department of Energy
  4. Carbon Dioxide Capture from Large Point Sources

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 45

    76045-The capture of carbon dioxide at the source of its emission has been a major focus in greenhouse gas emission control. Solutions must be both compact and economic, and also address the removal of other acid gases from natural gas streams. Current technologies used for capturing CO2 suffer from inefficient mass transfer and economics. This project will develop a stable, membrane-based, CO2 ...

    SBIR Phase I 2004 Department of Energy
  5. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  6. Step-Out Technology for Producing Hydrogen from Natural Gas

    SBC: Exelus, Inc.            Topic: 45

    75270-Steam methane reforming (SMR), the predominant commercial route for producing hydrogen, is a capital-intensive process ¿ capital charges represent 35-45% of product cost. In order to achieve the significant cost reductions required for the transition to a ¿hydrogen economy,¿ a meaningful shift in the underpinning reactor technology will be needed. This project will develop a safe, cost- ...

    SBIR Phase I 2004 Department of Energy
  7. Single Crystal Molybdates for Neutrinoless Double Beta Decay Experiments

    SBC: Integrated Photonics, Inc.            Topic: 16

    75593-The Neutrinoless Double Beta Decay Underground Detector has been identified by the DOE as a high scientific priority for Nuclear Physics research; however, the current generation of proposed experiments to determine neutrino mass would require 500 kg of germanium (Ge), isotopically enriched to 86% in 76Ge, costing more than $100 million. Therefore, several alternate parent isotopes for neut ...

    SBIR Phase I 2004 Department of Energy
  8. CONTROL-

    SBC: JONAS, INC.            Topic: N/A

    CORROSION, CONTAMINATION, AND SCALE FORMATION CAUSED BY IMPURITIES IN WATER AND STEAM IN THE NUCLEAR POWER REACTOR CYCLES ARE MAJOR AND COSTLY PROBLEMS OF THE US UTILITY INDUSTRY. CORROSION CRACKING AND DENTING OF THE PRESSURIZED WATER REACTOR (PWR) CYCLE STEAM GENERATOR TUBES AND STRESS CORROSION OF THE BOILING WATER REACTOR (BWR) PIPING AND OF TURBINE DISCS ARE A FEW EXAMPLES OF THE CORROSION PR ...

    SBIR Phase I 1985 Department of Energy
  9. Rapidly Tunable, High Throughput Spectral Filter for Plasma Diagnostics

    SBC: NOVA PHOTONICS INC            Topic: 1

    75843-Improving the sensitivity and time resolution of spectroscopic plasma diagnostics is required to further understanding and progress in the development of fusion energy as an economically attractive energy source. Higher throughput spectroscopic diagnostics not only will benefit present experiments, but also will be important for the next generation of fusion devices, such as ITER. Although ...

    SBIR Phase I 2004 Department of Energy
  10. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
US Flag An Official Website of the United States Government