Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until September, 2020.

  1. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: Continuum Dynamics Inc            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  2. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  3. DIFFERENTIALLY DRIVEN GENERATORS (DDG)

    SBC: Transmission Technology Co Inc            Topic: N/A

    TRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...

    SBIR Phase I 1985 Department of Transportation
  4. OPERATIONS

    SBC: Transmission Technology Co Inc            Topic: N/A

    COST OF CARGO HANDLING OPERATIONS CAN BE REDUCED BY EQUIPMENT THAT USES LESS TIME AND ENERGY TO PERFORM AND RANDREQUIRES LESS MANPOWER TO OPERATE, MONITOR, AND MAINTAIN. ONE OBJECTIVE OF THIS PROPOSAL IS TO EVOLVE A PRELIMINARY DESIGN OF A REPRESENTATIVE PIECE OF MACHINERY, NAMELY A MOORING/WARPING AUTOMATIC TENSIONING WINCH USING ADVANCED ELECTRO-MECHANICAL TECHNOLOGY, ELIMINATING HYDRAULICS AND ...

    SBIR Phase I 1985 Department of Transportation
  5. WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT.

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT. THIS IN TURN LEADS TO THE REQUIREMENT FOR AN INTEGRATED TRACK MAINTENANCEFORECASTING AND PLANNING SYSTEM THAT WILL ENABLE TRACK MAIN TENANCE SUPERVISORS TO EFFECTIVELY PLAN THEIR MAINTE ...

    SBIR Phase I 1985 Department of Transportation
  6. Rapid detection of food borne pathogenic bacteria

    SBC: Allied Innovative Systems LLC            Topic: N/A

    DESCRIPTION (provided by applicant): The objective of this proposal is to develop an ultrasound particle agglutination (UPA) method for determination of pathogenic bacteria Escherichia coli O157:H7 and Listeria monocytogenes in body fluids, food and envi

    SBIR Phase I 2004 Department of Health and Human Services
  7. Ultrasound monitored HIV rapid test

    SBC: Allied Innovative Systems LLC            Topic: N/A

    DESCRIPTION (provided by applicant): The objective of this proposal is to demonstrate the feasibility of a novel method for detection of human immunodeficiency virus (HIV) antibody in the body fluids. The method is based on the use of ultrasound to signi

    SBIR Phase I 2004 Department of Health and Human Services
  8. Colonoscope Force Monitor

    SBC: ARTANN LABORATORIES, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): Several million screening, diagnostic and therapeutic colonoscopies are performed each year in the U.S. hospitals and ambulatory surgery centers. The application of force to the colon and its anatomic attachments ca

    SBIR Phase I 2004 Department of Health and Human Services
  9. A Novel Probabilistic Engine for Virtual Screening

    SBC: BIOCOMPUTING GROUP INC            Topic: N/A

    DESCRIPTION (provided by applicant): The goal of this work is to provide a novel probabilistic computational engine for docking-based virtual screening. The engine is based on probabilistic model of Markov Random Fieds (MRF). MRF's have proven successful

    SBIR Phase I 2004 Department of Health and Human Services
  10. THE NEED FOR PATENT SMALL DIAMETER VASCULAR GRAFTS IS IMMEDIATE.

    SBC: Biomatrix Inc.            Topic: N/A

    THE NEED FOR PATENT SMALL DIAMETER VASCULAR GRAFTS IS IMMEDIATE. AT PRESENT THERE IS NO FDA-APPROVED SMALL VESSEL GRAFT OF 5MM OR SMALLER; SMALL DIAMETER (58MM) GRAFTS CURRENTLY IN USE (DACRON, EXPANDED POLYTETRAFLUOROETHYLENE (PTFE) TEFLON, AUTOLOGOUS SAPHENOUS VEIN, UMBILICAL VEIN BIOGRAFT) GENERALLY PERFORM POORLY. HYALURONIC ACID IS A NATURAL BIOPOLYMER AND AN UBIQUITOUS GLYCOSAMINOGLYCAN COMP ...

    SBIR Phase I 1985 Department of Health and Human Services
US Flag An Official Website of the United States Government