You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTER TECHNOLOGY TO EVALUATE AIRCRAFT VORTEX WAKE INTENSITY

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    THERE DOES NOT EXIST TODAY A UNIFIED MEANS OF EVALUATING THE VORTEX INTENSITY BEHIND COMMERCIAL JET LINERS PRIOR TO PROTOTYPE DEVELOPMENT AND TESTING AT FULLSCALE. OVER THE PAST SEVERAL YEARS, DATA AND ANALYTICAL DEVELOPMENTS HAVE PROVIDED MUCH ADDITIONAL TECHNOLOGY WHICH MAY MAKE POSSIBLE THE PREDICTION OF WAKE INTENSITY AND DECAY FROM FIRST PRINCIPLES. THE OBJECT OF THIS INVESTIGATION IS TO DEMO ...

    SBIR Phase II 1985 Department of Transportation
  2. UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT.

    SBC: CONTINUUM DYNAMICS INC            Topic: N/A

    UNDER IFR CONDITIONS, AIRPORT CAPACITY IS CURRENTLY LIMITED BY FAA SEPARATION STANDARDS BETWEEN AIRCRAFT. THESE STANDARDS ARE SET TO AVOID A LANDING ENCOUNTER WITH A VORTEX WAKE. IF AN ONBOARD VORTEX SENSOR AN ESCAPE SYSTEM COULD BE DEVELOPED WHICH IS BOTH RELIABLE AND INEXPENSIVE, THE A AVIATION COMMUNITY COULD BENEFIT BY DECREASED TERMINAL DELAYS WITHOUT COMPROMISING SAFETY. THE CONCEPT TO BE ST ...

    SBIR Phase I 1985 Department of Transportation
  3. A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED.

    SBC: Genovese Associates            Topic: N/A

    A PROOF-OF-CONCEPT PROJECT SHOWING FEASIBILITY OF A SEMIAUTOMATIC SYSTEM INTEGRATING ILS, MLS AND EN ROUTE NAVIGATION FOR LIGHT AIRCRAFT IS PROPOSED. THE PURPOSE OF THE SYSTEM IS TO INCREASE NAVIGATION PRESISION AND S D SIMPLICITY, ESPECIALLY IN THE RNAV AND MLS ENVIRONMENTS. THESYSTEM WOULD ALSO ENHANCE AIR TRAFFIC CONTROL CAPACITY, REDUCE PILOT WORKLOAD, AND IMPROVE SAFETY MARGINS. INFORMATION W ...

    SBIR Phase I 1985 Department of Transportation
  4. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  5. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  6. DIFFERENTIALLY DRIVEN GENERATORS (DDG)

    SBC: Transmission Technology Co Inc            Topic: N/A

    TRADITIONALLY, SHIPBOARD POWER GENERATION IS ACCOMPLISHED VIA AUXILIARY ENGINES AND GENERATOR SETS. SIGNIFICANT COST ADVANTAGES CAN BE PROJECTED IF THIS ELECTRICAL DEMAND COULD BE MET BY EXTRACTING POWER FROM THE SHIP'S PRIME MOVER. TO ACCOMPLISH THIS, AND TO MAINTAIN A CONSTANT FREQUENCY ON THEGENERATOR WHILE THE SPEED OF THE PRIME MOVER VARIES OVER A WIDE RANGE, THIS CONTRACTOR PROPOSES THE USE ...

    SBIR Phase I 1985 Department of Transportation
  7. OPERATIONS

    SBC: Transmission Technology Co Inc            Topic: N/A

    COST OF CARGO HANDLING OPERATIONS CAN BE REDUCED BY EQUIPMENT THAT USES LESS TIME AND ENERGY TO PERFORM AND RANDREQUIRES LESS MANPOWER TO OPERATE, MONITOR, AND MAINTAIN. ONE OBJECTIVE OF THIS PROPOSAL IS TO EVOLVE A PRELIMINARY DESIGN OF A REPRESENTATIVE PIECE OF MACHINERY, NAMELY A MOORING/WARPING AUTOMATIC TENSIONING WINCH USING ADVANCED ELECTRO-MECHANICAL TECHNOLOGY, ELIMINATING HYDRAULICS AND ...

    SBIR Phase I 1985 Department of Transportation
  8. WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT.

    SBC: Zeta-Tech Associates, Inc.            Topic: N/A

    WITH THE GROWING COST OF TRACK MAINTENANCE FOR HEAVY AND LIGHT RAIL TRANSPORTATION SYSTEMS, THE NEED FOR EFFECTIVE MAINTENANCE PLANNING AND FORECASTING OF MAINTENANCE REQ UIREMENTS HAS BECOME MORE READILY APPARENT. THIS IN TURN LEADS TO THE REQUIREMENT FOR AN INTEGRATED TRACK MAINTENANCEFORECASTING AND PLANNING SYSTEM THAT WILL ENABLE TRACK MAIN TENANCE SUPERVISORS TO EFFECTIVELY PLAN THEIR MAINTE ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government