You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. POST CRASH AIRCRAFT FUEL-FED PREVENTION

    SBC: BELTRAN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Transportation
  2. SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS

    SBC: Gourary Assoc Inc            Topic: N/A

    THE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...

    SBIR Phase I 1987 Department of Transportation
  3. DEVELOPMENT OF A CAR BED FOR PREMATURE AND PHYSICALLY DISABLED INFANTS

    SBC: HARTLEY ASSOCIATES, INC.            Topic: N/A

    IT IS A UNIVERSALLY ACCEPTED FACT THAT THE PROPER USE OF WELL DESIGNED INFANT AND CHILD RESTRAINT SYSTEMS CAN SIGNIFICANTLY DECREASE THE RISK OF DEATH AND SERIOUS INJURY IN MOTOR VEHICLE CRASHS INVOLVING NORMAL CHILDREN. HOWEVER,WHEN PREMATURE INFANTS ARE PLACED IN SEMI-RECLINED INFANT SAFETY SEATS THERE IS A POTENTIAL FOR RESPIRATORY COMPROMISE. IN ADDITION, MANY DISABLED INFANTS ARE UNABLE TO TR ...

    SBIR Phase I 1987 Department of Transportation
  4. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
US Flag An Official Website of the United States Government