You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Practical Roots of Trust for Mobile Devices
SBC: GALOIS, INC. Topic: HSB0132002To meet the critical security needs of the Department of Homeland Security and others, we propose two methods for providing a secure root of trust for mobile devices. One method is designed to integrate as easily into existing systems, while the other requires deeper integration but provides correspondingly stronger security. The keys to our work are practicality and integration: practicality to e ...
SBIR Phase I 2013 Department of Homeland Security -
Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: 941DIn the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...
SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration -
Intelligent In-Line Power Disconnect System
SBC: Integrated Solutions for Systems, Inc. Topic: HSB0131005This proposal is for an intelligent, in-line, power disconnect system (I2P) which is directly applicable to existing power line infrastructure. It requires no interruption in utility service for installation. The proposed connection would be coupled with strain sensing gauges and an array of sensors to facilitate gathering of real-time usage statistics, and assist in determining locations of dow ...
SBIR Phase I 2013 Department of Homeland Security -
Quick Disconnect System for Power Distribution Hardening and Resiliency
SBC: STREAMLINE AUTOMATION LLC Topic: HSB0131005Recent data shows that reported natural disasters have nearly ten-folded over the past century. Aside from the threat to human lives, they pose a great threat to America's infrastructure and power grid. Nearly 90% of all power interruption occurs at the distribution level and over 75% of these are weather related. The proposed Phase I effort aims to combat these unavoidable threats by developin ...
SBIR Phase I 2013 Department of Homeland Security -
Pedestrian Auto Enforcement Program (PAEP)
SBC: POLARIS SENSOR TECHNOLOGIES INC Topic: 122FH3We propose an innovative Pedestrian Automotive System for Enforcement and Safety (PASES) that combines commercial-off-the-shelf video or camera components and state-of-the-art microwave(radar) systems with sophisticated software that will not only provide more effective enforcement through effective evidentiary information, but will also enable predictive actions based on vehicle and pedestrian be ...
SBIR Phase I 2013 Department of Transportation -
Creating Spatial Disorientation in Flight Simulation
SBC: CONTINUUM DYNAMICS INC Topic: 122FA1Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...
SBIR Phase I 2013 Department of Transportation