You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Creating Spatial Disorientation in Flight Simulation

    SBC: CONTINUUM DYNAMICS INC            Topic: 122FA1

    Training in the symptoms of Spatial Disorientation (SD) has shown to be valuable in aiding pilots to recognize its onset and provide a means for mitigating its effects, but such demonstrations have traditionally been associated with specialized equipment and devices. Since the vast majority of pilots for the commercial aviation jet fleet are trained (or recertified) on 6-degree-of-freedom (DOF) h ...

    SBIR Phase I 2013 Department of Transportation
  3. Environmentally Safe Wood Preservatives

    SBC: NOVAFLUX TECHNOLOGIES, INC.            Topic: C3NCERA1

    The goal of this Phase I research project is to study a new class of environmentally safe wood preservatives based on cation-anion complexes with antimicrobial activities. The proposed cations include: (1) biguanide/polybiguanide derivatives, (2) polyionenes (polyquats), and (3) quaternary ammonium salts. The associated anions needed to form the complex will be selected from triclosan, ...

    SBIR Phase I 2004 Environmental Protection Agency
  4. An Artificial Neural Network and Optimization Methodology for Detecting and Managing Terrorist Attack Against Water Distribution Systems

    SBC: Neural Optimization Applied Hydrology, LLC            Topic: C3NCERB4

    The goals of this Phase I research project are to investigate the feasibility of using an artificial neural network (ANN) and an optimization-based water distribution security system ("smart security") for accurately detecting contamination events, and given the nature of the threat, identify optimal crisis management decisions that minimize the threat and maintain a safe water supp ...

    SBIR Phase I 2004 Environmental Protection Agency
  5. Commercialization of a Kenaf-Based Biosorptive Process for Use in the Treatment of Contaminated Aqueous Streams

    SBC: KenGro Corporation            Topic: C3NCERD1

    Conventional wastewater and groundwater cleanup technologies all have inherent limitations associated with costs, performance, and operational protocols. Clearly, new processes that can reduce costs, maintain or even improve treatment, and reduce technical complexity will be a great asset to the environmental engineering community. The KenGro Corporation proposes to develop an innovat ...

    SBIR Phase I 2004 Environmental Protection Agency
  6. Novel Membrane Systems for Off-Road Diesel Engine NOx Reduction

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: C3NCERD3

    The Bush Administration recently proposed a 90 percent reduction of air pollution emissions from off-road diesel equipment. The Administration indicated that diesel emissions are responsible for large amounts of particulate and NOx emissions from off-road construction, farm, mining, and locomotive and marine engines. A primary approach used to reduce NOx emissions is exhaust gas recirc ...

    SBIR Phase I 2004 Environmental Protection Agency
  7. Novel Membrane Systems for Off-Road Diesel Engine NOx Reduction

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: N/A

    The Bush Administration recently proposed a 90 percent reduction of air pollution emissions from off-road diesel equipment. The Administration indicated that diesel emissions are responsible for large amounts of particulate and NOx emissions from off-road construction, farm, mining, and locomotive and marine engines. A primary approach used to reduce NOx emissions is exhaust gas recirculation (E ...

    SBIR Phase I 2004 Environmental Protection Agency
  8. Commercialization of a Kenaf-Based Biosorptive Process for Use in the Treatment of Contaminated Aqueous Streams

    SBC: KenGro Corporation            Topic: N/A

    The state of affairs facing engineers and scientist attempting to treat low level contaminated water using current technologies results in the selection of a process that has significant shortcomings. A technically superior, yet operationally simpler treatment process within a reduced cost bracket is needed to assist industries in meeting ever changing environmental regulations. One of KenGro¿s ...

    SBIR Phase I 2004 Environmental Protection Agency
  9. An Artifical Neural Network and Optimization Methodology for Detecting and Managing Terrorist Attack Against Water Distribution Systems

    SBC: Neural Optimization Applied Hydrology, LLC            Topic: N/A

    The goals of this Phase I research project are to investigate the feasibility of using an artificial neural network (ANN) and an optimization-based water distribution security system (¿smart security¿) for accurately detecting contamination events, and given the nature of the threat, identify optimal crisis management decisions that minimize the threat and maintain a safe water supply. Given th ...

    SBIR Phase I 2004 Environmental Protection Agency
  10. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
US Flag An Official Website of the United States Government