You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. "Night Glow"Short Wave Infrared LED (NSLED) Image Projector Development

    SBC: Chip Design Systems Inc.            Topic: AF131098

    ABSTRACT: This project aims to develop a Short Wave Infrared band image projector to provide real time detector stimulation with high dynamic range. Our emitter technology is based on GaInAsSb quaternary semiconductor LED arrays hybridized to CMOS read-in integrated circuits. This project leverages read-in circuit design and control electronics that were developed under SLEDS - a longer wavelengt ...

    SBIR Phase I 2013 Department of DefenseAir Force
  2. Modeling & Simulation Framework for Robust Process Design of Thermoset Prepregs

    SBC: COMPOSITES AUTOMATION LLC            Topic: AF191109

    Composites Automation LLC and partner University of Delaware Center for Composite Materials proposes to expand their previously developed software framework for void modeling in autoclave prepreg manufacturing to include process aids (vacuum bag, breathers, bleeders, release films) and their influence on the process, and develop methodologies to assess effects of material and technician variabilit ...

    SBIR Phase I 2019 Department of DefenseAir Force
  3. Packaging High Power Photodetectors for 100 MHz to 100 GHz RF Photonic Applications

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF131142

    ABSTRACT: In this SBIR effort we will develop a packaging process and demonstrate (Phase I) a prototype of high power Photodiode (PD) that has a normal incident, pigtailed fiber input and a coaxial RF output that operates from DC to>60GHz. We will apply and extend (Phase II) the aforementioned packaging process to single PD, balanced PD and array of PDs that work from DC through entire W-band. De ...

    SBIR Phase I 2013 Department of DefenseAir Force
  4. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  5. 6U CubeSat EO/IR Solutions for Operational Weather Demo

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF191006

    In this Phase I Air Force SBIR program, Phase Sensitive Innovations seeks deployment of a hyperspectral microwave photonic radiometer operating full band at V-Band (50-75 GHz) and/or G-Band (110-300 GHz) with 1 GHz spectral resolution on a 6U CubeSat bus in polar orbit for remote sensing applications. Our payload consumes about 2U, while 4U are available for avionics (e.g. attitude control, power, ...

    SBIR Phase I 2019 Department of DefenseAir Force
  6. Network Capable Concurrent Design Facility & Portfolio Digital Engineering Platform

    SBC: InnoVet LLC            Topic: AF192001

    The seeds of failures of Defense projects can often be traced back to poor quality requirements and a lack of portfolio level coherence between associated projects. Because projects have become so complex, 100% paper-based methods are no longer suitable for requirements management. In June 2018, the DoD released its Digital Engineering Strategy which calls on the services to “move the primar ...

    SBIR Phase I 2019 Department of DefenseAir Force
  7. Commercial Solutions for Weather Forecasting

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF182001

    Accurate and timely weather information for situational awareness is critical to the success of Air Force missions. To date, space-borne sensors for weather forecasting primarily include visible, infrared, and microwave instruments. While visible and infrared sensors have reached a high level of maturity and performance, those operating in the microwave region of the electromagnetic spectrum conti ...

    SBIR Phase I 2019 Department of DefenseAir Force
  8. Taking the Risk out of Running

    SBC: ACE Running LLC            Topic: AF192001

    Our innovative 3D Motion Analysis technology allows for fast and efficient screening of running technique in military personnel that has previously not been available to this scale. We propose providing education and training on our portable 3D Motion Analysis technology to military personnel to explore new ways to utilize this technology. The education and training will focus on ways to identify ...

    SBIR Phase I 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government