You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Digital System-On-Chip CO2 Sensor

    SBC: N5 SENSORS INC            Topic: DEFOA0001738

    N5 Sensors have teamed up with University of Tennessee, Molecule Works Inc., and Syracuse University Center of Excellence for Environmental and Energy Systems to develop and commercialize a breakthrough digital system-on-chip (SoC) CO2 sensor technology that will satisfy the ARPA-E’s SENSOR program’s energy saving goal in commercial and residential buildings. This project represent a collabora ...

    SBIR Phase I 2018 Department of EnergyARPA-E
  2. Low Ground Clearance Vehicle Detection and Warning System

    SBC: Intelligent Automation, Inc.            Topic: 131FR1

    The problem of low ground clearance vehicles being stuck at tracks of highway-rail grade crossings (HRGC) poses a severe safety risk. Vehicles with long wheelbases and low ground clearance are more likely to be stuck on high-profile HRGCs. Currently there is no commercially available automated system that detects and computes the necessary critical dimensions of low ground clearance vehicles (LGCV ...

    SBIR Phase I 2013 Department of Transportation
  3. Low Ground Clearance Vehicle Detection and Warning System

    SBC: ADVANCED TECHNOLOGY AND RESEARCH CORPORATION            Topic: 131FR1

    Highway-rail crossing, at which there is an unusually abrupt change in the level of the road's surface as it crosses the tracks, pose a risk of low ground clearance vehicles becoming stuck on the tracks. Advanced Technology and Research Corporation (ATR) proposes to develop an active detection and advance warning system. The system has three major functional componenets: measurement, decision, ...

    SBIR Phase I 2013 Department of Transportation
  4. Reading Barcode signs to Support V21 Safety

    SBC: Intelligent Automation, Inc.            Topic: 180FH1

    Reading Barcode Signs to Support V21 Safety 3/20/2018 For this SBIR we will develop a machine vision system which uses onboard standard-resolution cameras in vehicles to identify and read barcode signs on the roadside. The proposed approach could provide a low-cost solution that make connected and automated vehicle (CAV) technology viable for rural areas with limited access to Information and ...

    SBIR Phase I 2018 Department of Transportation
  5. An Artificial Intelligence (AI) Traffic Data Analysis Tool for Advanced Freeway Traffic Management

    SBC: Intelligent Automation, Inc.            Topic: 180FH4

    An Artificial Intelligence (AI) Traffic Data Analysis Tool for Advanced Freeway Traffic Management 3/20/2018 Planned or unplanned traffic events cause various magnitude of traffic congestion and safety impact to road users. It was estimated that 60% of congestions are non-recurrent and 15% of incidents are secondary to the primal accidents. Thus local or regional Traffic Management Centers (T ...

    SBIR Phase I 2018 Department of Transportation
  6. Climate Impact Visualization Tools Using Virtual 3D City for Community Based Planning and Outreach

    SBC: Intelligent Automation, Inc.            Topic: 931RC

    Intelligent Automation, Inc. proposes an innovative visualization tool that transforms online GIS mappers into a climate impact assessment and planning tool that allows planners to visualize the impact of storm surges with sea level rise and coastal erosion using a 3D virtual city. The goal is to assist planners and emergency services to adapt to climate change at three tiers: i) Tier 3 (Long-te ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
  7. Dynamic Frequency Passive Millimeter-Wave Radiometer Based on Optical Up-Conversion

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: 941D

    In the proposed effort, we will leverage this extensive experience and capabilities to realize a frequency agile mmW radiometer that can cover the range of DC-110 GHz and can be scaled to DC-200 GHz under Phase II. Ours is a photonic system that multiplies and up-coverts a low-frequency reference signal onto an optical carrier (laser) using EO modulation, then uses the modulation sidebands to inj ...

    SBIR Phase I 2013 Department of CommerceNational Oceanic and Atmospheric Administration
US Flag An Official Website of the United States Government