You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Chemical Nano-Imprint Lithography

    SBC: EM PHOTONICS INC            Topic: SB041030

    The overall objective of this Phase II project is to optimize the fabrication procedure associated with the chemical lithography proposed in Phase I to fabricate nanophotonic structures and devices at a fraction of the cost of existing technologies. We plan to use our optimized chemical lithography procedure to fabricate an ultra-high resolution patterns and devices including nano-probe for near f ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  2. Hardware Assisted Electronic Circuit Simulation System

    SBC: EM PHOTONICS INC            Topic: SB041029

    In Phase I, EM Photonics demonstrated the viability of using a reconfigurable hardware approach to accelerating the simulation of electronic circuits based on their electromagnetic properties. In Phase II, this technology will be used to create a solver capable of analyzing mixed signal circuits 64 times faster than is currently available from equivalent software. The resulting device will shrin ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  3. Lightweight High Specific Energy Power System for High Altitude Airships

    SBC: MICROSAT SYSTEMS            Topic: SB052024

    The DoD has numerous space sensor and communications systems that are baselined for high altitude airships (HAA). These systems require continuous power for maintaining airship position and operating the sensor and communications systems. Because of the on-station time periods of the HAA of up to one year, on board stored fuel is not a feasible option for providing power to the HAA. Therefore, ...

    SBIR Phase I 2005 Department of DefenseDefense Advanced Research Projects Agency
  4. Physically-Small VHF SAR Antenna

    SBC: FIRST RF CORPORATION            Topic: SB041023

    The challenge of transferring VHF FOPEN technology to small tactical platforms lies in achieving adequate antenna characteristics within the allowable size, weight, and mechanical constraints. FIRST RF has developed during Phase I a simple, novel approach to meeting the tough performance requirements. The key elements of the FIRST RF innovative design include: innovative broadband beamforming con ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government