You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Secure Battlefield Munition Communications and Angular Position Accuracy for Enhanced Lethality
SBC: OMNITEK PARTNERS LLC Topic: A22003The objective of the proposed project is the development of methods for secure battlefield communication with munitions to ensure orientation and position and target information accuracy; to eliminate the possibility of spoofing; to enhance target intercept capabilities; and to increase target intercept precision and lethality. The methods for secure battlefield communication to munitions and the ...
SBIR Phase I 2023 Department of DefenseArmy -
BioSIPs®: Transforming Waste Paper and Biofibers into Building Materials?
SBC: BIOSIPS, INC. Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Power Management for Energy Resiliency
SBC: PC KRAUSE & ASSOCIATES INC Topic: A224015Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Advanced Superconducting Cables for Aircraft
SBC: E-VOLV, INC. Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Algae- Based Sustainable Building Materials
SBC: FLORA MATERIALS LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Wearable Sensor for Warfighters
SBC: TDA RESEARCH, INC. Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Health Analysis from Vibrational Optical Characterization: HAVOC-Wear
SBC: Organic Robotics Corporation Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Portable Hydrogen Generator for Vehicle Fleet Refueling
SBC: TDA RESEARCH, INC. Topic: A234012Redacted
SBIR Phase II 2023 Department of DefenseArmy -
ATAK Smart Garments for Automatic Wound Detection (Shot, Shrapnel, Cut) and Treatment
SBC: LEGIONARIUS LLC Topic: A224017Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Soteria- Machine Learning for Breach Routing
SBC: OUTSIDE ANALYTICS INC Topic: A214048Redacted.
SBIR Phase II 2023 Department of DefenseArmy