You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Demonstration of 2.5kW/10kWh Vanadium Redox Flow Battery (VRFB) through rationally designed high energy density electrolytes and Membrane-Electrode Assembly (MEA)

    SBC: ITN ENERGY SYSTEMS, INC.            Topic: 1

    ITN Energy Systems, Inc. (ITN) is proposing demonstration and deployment of 2.5kW/10kWh Vanadium Redox Flow Battery (VRFB) technology through a multi-faceted effort based on 1) Novel V-electrolytes based on Fluorinated Carboxylates, 2) Low-cost (and superior) proton exchange membrane and 3) “zero-gap” membrane-electrode assembly. The Fluorinated V-carboxylates are a new class of V-salts with t ...

    SBIR Phase II 2012 Department of EnergyARPA-E
  2. Demonstration of 2.5kW/10kWh Vanadium Redox Flow Battery (VRFB) through rationally designed high energy density electrolytes and Membrane-Electrode Assembly (MEA)

    SBC: ITN ENERGY SYSTEMS, INC.            Topic: 1

    ITN Energy Systems, Inc. (ITN) is proposing demonstration and deployment of 2.5kW/10kWh Vanadium Redox Flow Battery (VRFB) technology through a multi-faceted effort based on 1) Novel V-electrolytes based on Fluorinated Carboxylates, 2) Low-cost (and superior) proton exchange membrane and 3) “zero-gap” membrane-electrode assembly. The Fluorinated V-carboxylates are a new class of V-salts with t ...

    SBIR Phase I 2012 Department of EnergyARPA-E
  3. Smart Pipeline Network- Cased Pipe for Monitoring and Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH3

    This PHMSA SBIR focuses on the development of a new multi-channel cased in pipe design with internal support structure that will allow access along its entire axial length while adequately securing the carrier pipe to the containment pipe. When combined with the Seal Sensor System (proposed separately), this technology will allow a Smart Pipeline Network having integrated sensor networks that pro ...

    SBIR Phase I 2012 Department of Transportation
  4. Smart Pipeline Network- Pipe & Repair Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH2

    This PHMSA SBIR focuses on the development of a Pipe and Repair Sensor System. When combined with the Seal Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, smart pipes and smart composites repair having integrated leak detecti ...

    SBIR Phase I 2012 Department of Transportation
  5. Smart Pipeline Network- Seal Sensor System

    SBC: Odyssian Technology, L.L.C.            Topic: 121PH1

    This PHMSA SBIR focuses on the development of a Seal Sensor System. When combined with the Pipe and Repair Sensor System (proposed separately), this technology will allow for a Smart Pipeline Network having integrated sensor networks that provide for continuous real-time monitoring of leaks and system health. In this program, sensor-seals having both sealing and force sensing functionality, as w ...

    SBIR Phase I 2012 Department of Transportation
US Flag An Official Website of the United States Government