List

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until April, 2020.

  1. METHODOLOGY FOR CORRELATION OF ATC CONTROLLER WORKLOAD AND ERRORS

    SBC: Computer Technology Associates            Topic: N/A

    THE PURPOSE OF THIS RESEARCH IS TO STUDY THE FEASIBILITY OF QUANTIFYING THE EFFECTS OF IREASED AUTOMATION ON THE WORKLOAD AND PERFORMANCE OF THE FEDERAL AVIATION ADMINISTRA-TION'S AIR TRAFFIC CONTROLLER. IN PHASE I, RESEARCH WILL FOCUS ON ADAPTRING OUR CURRENT HUMAN PERFORMANCE MODEL TO REPRESENT THE JOB CHARACTERISTICS OR ATTRIBUTES THAT WILL DETERMINE LEVELS OF WORKLOAD AND PERFORMANCE IN THE AD ...

    SBIR Phase II 1987 Department of Transportation
  2. RESEARCH ON AN AIRBORNE WIND SHEAR SENSOR

    SBC: OPHIR CORPORATION            Topic: N/A

    THE RECOGNIZED LOW LEVEL WIND SHEAR PHENOMENON KNOWN AS A MICROBURST POSES A SERIOUS AIR SAFETY THREAT TO COMMERCIAL AVIATION WHILE IN A LANDING OR POSES A SERIOUS COMMERCIAL AVIATION WHILE IN A LANDING OR TAKEOFF PATTERN. THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO DE A THIS LOW LEVEL WIND SHEAR HAS BEEN DEMONSTRATED TO BE A MAJOR CONTRIBUTING FACTOR TO SEVERAL CRASHES OF COMMERCIAL AIRLIN ...

    SBIR Phase II 1987 Department of Transportation
  3. ELECTRONIC EQUIPMENT SHELTERS

    SBC: Advanced Composite Technology            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseAir Force
  4. ARCHITECTURE EVALUATION TEST BED

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    THE ESTIMATION OF THE COMPUTER CAPACITIES REQUIRED TO SUPPORT A MISSION ARE USUALLY THE SUBJECT OF MUCH DISCUSSION. ESTIMATES OF THE WORKLOAD AND OTHER PARAMETERS VARY GREATLY. THE REASON FOR THIS IS THAT MOST APPLICATIONS DO NOT FIT THE TRADITIONAL TIMING AND SIZING EFFORT. NONE OF THE THREE COMPONENTS (WORKLOAD, PERFORMANCE REQUIREMENTS AND ARCHITECTURE) IS USUALLY PRESENT. WE CONTEND THAT THE M ...

    SBIR Phase I 1987 Department of DefenseNavy
  5. INTEGRATED RELIABILITY AND TIMING DESIGN ANALYSIS TOOL

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  6. THERMODYNAMIC VENT SYSTEM (TVS) OPTIMIZATION

    SBC: Aerospace Design & Development, Inc.            Topic: N/A

    THE OPERATIONS OF A THERMODYNAMIC VENT SYSTEM (TVS) WILL BE INVESTIGATED WITH THE GOAL OF OPTIMIZING THE PERFORMANCE OF THE CRYOGENIC STORAGE SYSTEM FOR LONG TERM STORAGE. A TEN YEAR STORAGE LIFE IS THE ULTIMATE GOAL TO BE ACHIEVED. THE EFFECTS OF THE VENTED GAS ON IMPROVING THE PERFORMANCE OF A MULTILAYER INSULATION SYSTEM WILL BE OPTIMIZED BY VARIATION OF PARAMETERS. THE OBJECTIVE IS TO MINIMIZE ...

    SBIR Phase I 1987 Department of DefenseAir Force
  7. WIND AND ENERGY BUDGET MEASUREMENT SYSTEM FOR DESERT TERRAIN

    SBC: American Minority            Topic: N/A

    A MICROCLIMATOLOGICAL WEATHER STATION DESIGN IS PROPOSED WHICH INCORPORATES RESEARCH QUALITY INSTRUMENTS CAPABLE OF MEASURING HEAT FLUXES DIRECTLY. RECENT TECHNOLOGICAL ADVANCES HAVE ENABLED THESE INSTRUMENTS TO OPERATE IN REMOTE, LOW POWER, UNATTENDED APPLICATIONS. ULTRASONIC TECHNOLOGY IS USED TO MEASURE SENSIBLE AND LATENT HEAT FLUXES USING THE EDDY CORRELATION METHOD. THE WEATHER STATION IS DE ...

    SBIR Phase I 1987 Department of DefenseArmy
  8. STANDOFF MINE DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
  9. VIBRATORY AGING AND STRESS RELIEF (VASR) FOR A7005 ALUMINUM WELDS

    SBC: Applied Fusion Technologies            Topic: N/A

    THE PRIMARY OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A METHOD THAT WILL IMPROVE BOTH THE RELIABILITY AND PREDICTABILITY OF WELDING AGE HARDENING ALUMINUM ALLOYS. THIS MAY BE ACCOMPLISHED BY USING AN IMPROVED VASR (VIBRATORY AGING AND STRESS RELIEF) SYSTEM, SQUARE WAVE PULSED ARC WELDING, AND POSSIBLY A COMBINATION OF BOTH TECHNIQUES. VASR TECHNIQUES INCLUDE TESTING IN BOTH THE SUBRESONANT AND RESO ...

    SBIR Phase I 1987 Department of DefenseArmy
  10. VARIATIONAL EVALUATION OF EM COUPLING TO A WIRE INSIDE A CAVITY

    SBC: Applied Physics Technologies            Topic: N/A

    CONTRACTOR WILL DEVELOP A LAGRANGIAN FORMULATION FOR THE ELECTROMAGNETIC RESPONSE OF A METALLIC ENCLOSURE WITH THIN, SLIGHTLY DIFFUSIVE WALLS AND A WIRE SPANNING THE ENCLOSURE. CONTRACTOR WILL FIRST DERIVE A LAGRANGIAN OPERATOR ON THE FIELDS WHICH IS STATIONARY WHEN MAXWELL'S EQUATIONS ARE SATISFIED. THE LAGRANGIAN WILL THEN BE USED TO DETERMINE THE ENCLOSURE EIGENMODES (WIRE INCLUDED) AND THE AMP ...

    SBIR Phase I 1987 Department of DefenseArmy

Agency Micro-sites

SBA logo
Department of Agriculture logo
Department of Commerce logo
Department of Defense logo
Department of Education logo
Department of Energy logo
Department of Health and Human Services logo
Department of Homeland Security logo
Department of Transportation logo
Environmental Protection Agency logo
National Aeronautics and Space Administration logo
National Science Foundation logo
US Flag An Official Website of the United States Government