Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. A CONFIGURABLE AUTOMATED LIBRARIAN FOR COMPUTER SOFTWARE SOURCE CODE

    SBC: Modular Software Systems            Topic: N/A

    COORDINATION OF THE SHARING OF SOURCE CODE IN MEDIUMETO LARGE-SCALE SOFTWARE DEVELOPMENT PROJECTS POSES A DIFFICULT PROBLEM IN THE ABSENCE OF A SOURCE CODE LIBRARIAN SYSTEM. UNFORTUNATELY, SYSTEMS OF THIS TYPE, WHILE POWERFUL AND FLEXIBLE, GENERALLY REQUIRE A LEVEL OF EXPERTISE AND COMMITMENT NOT COMMONLY FOUND IN THE APPLICATIONS CODE DEVELOPER. IN AN ATTEMPT TO ADDRESS THIS PROBLEM, THIS PROPOSA ...

    SBIR Phase II 1987 Department of DefenseNavy
  2. A PROPOSAL TO EVALUATE THE OBSERVABILITY OF ROTORCRAFT DUE TO ELEC TROSTATIC CHARGING

    SBC: Electro Magnetic            Topic: N/A

    TWO MECHANISMS ARE IDENTIFIED BY WHICH AN ELECTRICALLY CHARGED ROTORCRAFT MIGHT ACT AS A SOURCE OF ELECTROMAGNETIC RADIATION. THESE ARE NARROW BAND ELF RADIATION PRODUCED BY CURRENTS INDUCED BY ROTOR ROTATION AND BROADBAND ELECTROMAGNETIC RADIATION FROM P STATIC. IN ORDER TO DETERMINE WHETHER OR NOT RADIATION DUE TO THESE MECHANISMS IS DETECTIBLE A COMBINATION OF NUMERICAL MODELLING TECHNIQUES IS ...

    SBIR Phase I 1987 Department of DefenseNavy
  3. A SIMPLE SAFETY ARMING SWITCH

    SBC: Enfitek Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  4. ARCHITECTURE EVALUATION TEST BED

    SBC: ADVANCED SYSTEMS & TECHNOLOGIES INC            Topic: N/A

    THE ESTIMATION OF THE COMPUTER CAPACITIES REQUIRED TO SUPPORT A MISSION ARE USUALLY THE SUBJECT OF MUCH DISCUSSION. ESTIMATES OF THE WORKLOAD AND OTHER PARAMETERS VARY GREATLY. THE REASON FOR THIS IS THAT MOST APPLICATIONS DO NOT FIT THE TRADITIONAL TIMING AND SIZING EFFORT. NONE OF THE THREE COMPONENTS (WORKLOAD, PERFORMANCE REQUIREMENTS AND ARCHITECTURE) IS USUALLY PRESENT. WE CONTEND THAT THE M ...

    SBIR Phase I 1987 Department of DefenseNavy
  5. COMPUTER ARCHITECTURE/VERY HIGH LEVEL LANGUAGE DESIGN FOR BATTLE MANAGEMENT

    SBC: Space Tech Corp            Topic: N/A

    A STUDY OF THE EFFICIENCIES AND ENGINEERING TRADE-OFFS INTEGRATING REDUNDANT NUMBER SYSTEM WITH SYSTOLIC ARRAY PROCESSING ELEMENTS IN ORDER TO CAPTURE THE INHERENT FAULT TOLERANT PROPERTIES OF SIGNED DIGITS IS PROPOSED. USING SIGNED DIGITS REDUCES CARRY/BORROW DISTANCE TO A MINIMUM THUS REALIZING HIGHLY MODULARIZED AND COLUMNAR ARITHMETIC ENGINES. PROCESSING CELLS BECOME REGULAR WITH FEWER INTERCO ...

    SBIR Phase II 1987 Department of DefenseMissile Defense Agency
  6. DEVELOPMENT OF KNO(3) FERROELECTRIC MEMORIES

    SBC: Symetrix Corporation            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  7. DEVELOPMENT OF ANGULAR ACCELEROMETER

    SBC: A-TECH CORPORATION            Topic: N/A

    A RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...

    SBIR Phase II 1987 Department of Transportation
  8. ELECTRONIC GAAS-ON-SILICON MATERIAL FOR ADVANCED HIGH-SPEED OPTOELECTRONIC DEVICES

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseMissile Defense Agency
  9. FAST FIBER OPTIC SWITCH USING FERROELECTRIC LIQUID CRYSTALS

    SBC: Displaytech Incorporated            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of DefenseNavy
  10. FAST SHORTLINE TRACING FOR SURVIVABILITY/VULNERABILITY CODES

    SBC: Physics Mathematics &            Topic: N/A

    ALL SURVIVABILITY/VULNERABILITY COMPUTER CODES, INCLUDING THOSE FOR PROJECTILES, LASERS, AND RADIATION EFFECTS, INVOLVE TRACING SAMPLE PATHS (CALLED SHOTLINES) THROUGH COMPUTERIZED GEOMETRY MODELS. FOR COMPLEX EQUIPMENT, HUNDREDS OF THOUSANDS OF SHOTLINES ARE ANALYZED TO DETERMINE ITS VULNERABILITY TO VARIOUS WEAPON EFFECTS. THUS, THE SHOTLINE-TRACING COMPUTER CODES STRONGLY INFLUENCE THE ACCURACY ...

    SBIR Phase II 1987 Department of DefenseNavy
US Flag An Official Website of the United States Government