You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced ABIR Correlation and Fusion Algorithms for an Enhanced C2BMC
SBC: NUMERICA CORPORATION Topic: MDA07046The current U.S. Ballistic Missile Defense System (BMDS) is comprised of a range of components, the integration of which is the responsibility of the Command, Control, Battle Management, and Communications (C2BMC) system. In the current architecture, track data from Overhead Persistent Infrared (OPIR) systems and ground-based radar systems are processed separately. However, ongoing work is devel ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
Advanced LADAR Modeling
SBC: TAU TECHNOLOGIES LLC Topic: MDA08051This Small Business Innovative Research (SBIR) addresses simulation modeling of optical Laser Radar (LADAR) systems. Because of the tremendous wavelength advantages provided by modern LADAR systems over conventional RADAR technologies, more advanced directed energy (DE) and surveillance systems are beginning to incorporate laser based active imaging and ranging technologies. There is a need to eva ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
Aerosol Particle Spectrometer with Depolarization and Fluorescence (APSDF)
SBC: Droplet Measurement Technologies, LLC Topic: 822jj
SBIR Phase I 2010 Department of CommerceNational Oceanic and Atmospheric Administration -
Calibration techniques for very large arrays
SBC: FIRST RF CORPORATION Topic: MDA08030Phased array antenna systems are growing in use within military systems. These arrays of thousands of elements need precise control of the aperture distributions to meet requirements for gain, sidelobes, etc. Errors in these phase and amplitude distributions over time will degrade the performance of these apertures. FIRST RF favors simple concepts with little or no hardware impact that fully ch ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
Calibration techniques for very large arrays
SBC: FIRST RF CORPORATION Topic: MDA08030Phased array antenna systems are growing in use within military systems. These arrays of thousands of elements need precise control of the aperture distributions to meet requirements for gain, sidelobes, etc. Errors in these phase and amplitude distributions over time will degrade the performance of these apertures. FIRST RF favors simple concepts with little or no hardware impact that fully ch ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
Compact High Power Microwave Payloads
SBC: KTECH CORP. Topic: MDA08047Design and build compact, pulsed power devices for High Power Microwave (HPM) Payloads for small rockets and/or the Multiple Kill Vehicles (MKVs).The overall requirements for this solicitation are very demanding. Overall, an explosive pulsed power system is required to be able to drive an RF source. This eventually will include prime power, the generator, and a pulse forming circuit. While the ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
COMPUTER ARCHITECTURE/VERY HIGH LEVEL LANGUAGE DESIGN FOR BATTLE MANAGEMENT
SBC: Space Tech Corp Topic: N/AA STUDY OF THE EFFICIENCIES AND ENGINEERING TRADE-OFFS INTEGRATING REDUNDANT NUMBER SYSTEM WITH SYSTOLIC ARRAY PROCESSING ELEMENTS IN ORDER TO CAPTURE THE INHERENT FAULT TOLERANT PROPERTIES OF SIGNED DIGITS IS PROPOSED. USING SIGNED DIGITS REDUCES CARRY/BORROW DISTANCE TO A MINIMUM THUS REALIZING HIGHLY MODULARIZED AND COLUMNAR ARITHMETIC ENGINES. PROCESSING CELLS BECOME REGULAR WITH FEWER INTERCO ...
SBIR Phase II 1987 Department of DefenseMissile Defense Agency -
COMPUTER ARCHITECTURE/VERY HIGH LEVEL LANGUAGE DESIGN FOR BATTLE MANAGEMENT
SBC: Space Tech Corp Topic: N/AN/A
SBIR Phase I 1986 Department of DefenseMissile Defense Agency -
Design Modified Commercial CMOS for MDA IR FPAs
SBC: BFE Acquisition Sub II, LLC Topic: MDA08013Foreign missile threat will increase as ballistic missile technology becomes available on an international scale. Missile Defense Agency (MDA) requires high performance, high sensitivity and low noise infrared sensors for space based sensing applications that operate in environments where radiation hardness is essential to mission operation. Radiation hard by design (RHBD) readout integrated circu ...
SBIR Phase II 2010 Department of DefenseMissile Defense Agency -
DEVELOPMENT OF ANGULAR ACCELEROMETER
SBC: A-TECH CORPORATION Topic: N/AA RESEARCH EFFORT COMPLETED RECENTLY FOR THE AIR FORCE IDENTIFIED NEW TECHNOLOGIES FOR ANGULAR MOTION MEASUREMENT. TWO CONCEPTS WERE FOUND WHICH APPEAR TO OFFER POTENTIAL FOR AN EXCELLENT COMBINATION OF SMALL SIZE, WIDE DYNAMIC RANGE, WIDE BANDWIDTH AND EASE OF FABRICATION AND UTILIZATION. ONE DEVICE, CALLED A FLUID-FILLED BENDER BEAM, USES PIEZOCERAMICELEMENTS TO PRODUCE A SIGNAL PROPORTIONAL TO ...
SBIR Phase II 1987 Department of Transportation